Loading...
ST0301A-CS100618 (8/13/2010) Keith Marvin - RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> Date: 6/18/2010 5:30 PM Subject: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading I will be on site tomorrow, do you want us to meet tomorrow? So we can show him what we spoke about today or I could meet with him if you let me know what time he'll be there. Let me know what you would like for me to do. Dean -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 18, 2010 5:27 PM To: Dean Dumke Cc: bct@freese.com Subject: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading Caleb will visit the site tomorrow, and we'll talk about it again after that. Keith >>> "Dean Dumke" <deand@JRJPaving.com> 6/18/2010 5:23 PM >>> Keith, Is he going to revise the trees to be demo'd also? Since the area to be cleared has decreased under the bridge, I need to demo the other trees if possible. Since wall is moving the 2 in front of screening wall should be able to be saved with wall tying into screening wall. Also, the tree at the west side of Penfolds, Cedar Tree, - keep or remove. Dean -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 18, 2010 3:45 PM To: Dean Dumke Cc: Larry Davis Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading For your use in clearing on Monday. Caleb will sign and issue this sheet once he has worked out the wall issues. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>> Forgot the attachment. (8/13/2010) Keith Marvin - RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2 B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: Caleb Thornhill Sent: Friday, June 18, 2010 1:50 PM To: 'Keith Marvin' Cc: Engineer Subject: Bethel Road II - Revised Bridge Rip Rap grading Larry/Keith, Here is the revised rip rap grading around the bridge. We've limited to only underneath the bridge to eliminate channel regarding. Please review and call me with any questions you might have. I'm working with the contractor on the wall type and conflicts and I'm trying to amend the wall lengths. Once those are determined, I will reseal this sheet with the correct wall information on it. Call me if you have any questions. B. Caleb Thornhill P.E. Project Manager [cid:image001.jpg@01CB0EED.207704A0] Freese and Nichols, Inc.<http://www.freese.com/> * Main: 214-217-2200 * Direct: 214-217-2282 * Fax: 214-920-2565 * Email: bct@freese.com<mailto:bct@freese.com> ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. (8/8/2011) Keith Marvin - Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1 From: Keith Marvin To:deand@JRJPaving.com Date: 6/18/2010 4:58 PM Subject: Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading fyi... >>> Caleb Thornhill <bct@freese.com> 6/18/2010 4:55 PM >>> Keith, We decreased the riprap area to 480 sy. Based on this area, the quantity for 5" concrete riprap should be 67 cy. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 18, 2010 4:30 PM To: Caleb Thornhill Subject: Fwd: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading Do you have any quantities for this change? >>> "Dean Dumke" <deand@JRJPaving.com> 6/18/2010 4:31 PM >>> Keith, Can the engineer provide some quantities that changed on this? If we could get the difference from original bid, I could get this back to you faster. Dean -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 18, 2010 3:45 PM To: Dean Dumke Cc: Larry Davis Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading For your use in clearing on Monday. Caleb will sign and issue this sheet once he has worked out the wall issues. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>> Forgot the attachment. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: Caleb Thornhill Sent: Friday, June 18, 2010 1:50 PM To: 'Keith Marvin' (8/8/2011) Keith Marvin - Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2 Cc: Engineer Subject: Bethel Road II - Revised Bridge Rip Rap grading Larry/Keith, Here is the revised rip rap grading around the bridge. We've limited to only underneath the bridge to eliminate channel regarding. Please review and call me with any questions you might have. I'm working with the contractor on the wall type and conflicts and I'm trying to amend the wall lengths. Once those are determined, I will reseal this sheet with the correct wall information on it. Call me if you have any questions. B. Caleb Thornhill P.E. Project Manager [cid:image001.jpg@01CB0EED.207704A0] Freese and Nichols, Inc.<http://www.freese.com/> * Main: 214-217-2200 * Direct: 214-217-2282 * Fax: 214-920-2565 * Email: bct@freese.com<mailto:bct@freese.com> ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. (8/13/2010) Keith Marvin - FW: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> CC: <bct@freese.com>, "Butch Cross" <butchc@JRJPaving.com> Date: 6/18/2010 4:33 PM Subject: FW: FW: Bethel Road II - Revised Bridge Rip Rap grading Attachments: CV-ALL-PL-GRAD-LAYOUT-1.pdf Caleb, I need the revised CAD on these changes today. We are starting excavation on Monday. Can you send to me by end of day today? Dean -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, June 18, 2010 3:45 PM To: Dean Dumke Cc: Larry Davis Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading For your use in clearing on Monday. Caleb will sign and issue this sheet once he has worked out the wall issues. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>> Forgot the attachment. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: Caleb Thornhill Sent: Friday, June 18, 2010 1:50 PM To: 'Keith Marvin' Cc: Engineer Subject: Bethel Road II - Revised Bridge Rip Rap grading Larry/Keith, Here is the revised rip rap grading around the bridge. We've limited to only underneath the bridge to eliminate channel regarding. Please review and call me with any questions you might have. I'm working with the contractor on the wall type and conflicts and I'm trying to amend the wall lengths. Once those are determined, I will reseal this sheet with the correct wall information on it. Call me if you have any questions. (8/13/2010) Keith Marvin - FW: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2 B. Caleb Thornhill P.E. Project Manager [cid:image001.jpg@01CB0EED.207704A0] Freese and Nichols, Inc.<http://www.freese.com/> * Main: 214-217-2200 * Direct: 214-217-2282 * Fax: 214-920-2565 * Email: bct@freese.com<mailto:bct@freese.com> ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. Page 1 of 1 Engineer - FW: Bethel Road II - Revised Bridge Rip Rap grading From: Caleb Thornhill <bct @ free se. com> To: Keith Marvin <kmarvin @coppelltx.gov >, Engineer <Engineer @ci.coppell.tx.us> Date: 6/18/2010 1:52 PM Subject: FW: Bethel Road II - Revised Bridge Rip Rap grading Attachments: CV- ALL -PL -GRAD- LAYOUT -l.pdf Forgot the attachment. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 From: Caleb Thornhill Sent: Friday, June 18, 2010 1:50 PM To: 'Keith Marvin' Cc: Engineer Subject: Bethel Road II - Revised Bridge Rip Rap grading Larry /Keith, Here is the revised rip rap grading around the bridge. We've limited to only underneath the bridge to eliminate channel regarding. Please review and call me with any questions you might have. I'm working with the contractor on the wall type and conflicts and I'm trying to amend the wall lengths. Once those are determined, I will reseal this sheet with the correct wall information on it. Call me if you have any questions. B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax 214- 920 -2565 ® Email: bct _,freese.com This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4C 1 B7A08City_... 6/18/2010 STA 76+87.88, 22.00LT 0 10' 20' W. . "e � \ J8 +8524, 22.00'Ri STA J9 +90.61, 60.66LT INSTALL 25' SGT INSTALL (TL 2) TRANSITON — I MTV BEGIN TY C41I RAIL BEGIN RETAINING WALL 57A J9 +80.59, 22.00' LT INSTALL (R2) TRANSITION w o 0 —/� _ — - -G— N= 70JJ49J85 E= 2429057.94 \ \ STA 8, 2200(7 INSTALL (TL2) TRANSITON "'— , STA J9 +80.59, 22.001r END FY I1 RAIL NvS TALL SGT LL SGT ` I AI a ENO RETANING WALL — PP " ,� 70P OF WALL =49814 —E E E zP BOTTOM OF WALL= 490.14 E —7 _ _ E E E N= 70JJ534.91 E =2429175.59 37 +00 E E lB +DO ' - ulv RcROZv _ — — - TELEPROIVE — — - �/ STA J6 +87.88. 12.00OLT BEGIN N C411 RAIL BEGIN RETAINING WALL TOP OF WALL= 498.J4 BOTTOM OF WALL -494..34 N= 7037558.57 E= 2428841.41 1 "a / I _ w0 u — ARKER- II t It N z I-- J 2 – F �I I I I I I I I I I his 5 � BG a rnz 0 10' 20' W. . "e � \ J8 +8524, 22.00'Ri azi INS rs, AVS7ALL 25' SGi �EA o STA J9 +08.24, 22.00'Rr — I MTV BEGIN TY C41I RAIL BEGIN RETAINING WALL FOP OF WALL = 49721 BOTTOM OF WALL = 489.81 \ _ — - -G— N= 70JJ49J85 E= 2429057.94 \ STA J9 +08.24. 22.00'Rr INSTALL (TL2) TRANSITON 1 1 L49709 WALL = 497.09 m� BRIDGE GRADING AND GUARDRAIL I I N Wy Wo �= o Z I Z g I o n I F- I � J V) 0 � Z � a 0 o W �o o p - --- - - - - -- > p Z a J () � W Z 2 GR -1 SEO, 14 OF 80 0 10' 20' W. I SCALE UNDERCROI TELEPRO ARK O 0 Q NOTES: 1. SEE DT -1 FOR RETAINING WALL ANO CY C411 CONFIGURATION �L� W I Wy Wo �= o Z I Z g I o n I F- I � J V) 0 � Z � a 0 o W �o o p - --- - - - - -- > p Z a J () � W Z 2 GR -1 SEO, 14 OF 80