ST0301A-CS100618
(8/13/2010) Keith Marvin - RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1
From:
"Dean Dumke" <deand@JRJPaving.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>
Date:
6/18/2010 5:30 PM
Subject:
RE: FW: Bethel Road II - Revised Bridge Rip Rap grading
I will be on site tomorrow, do you want us to meet tomorrow? So we can
show him what we spoke about today or I could meet with him if you let
me know what time he'll be there. Let me know what you would like for
me to do.
Dean
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, June 18, 2010 5:27 PM
To: Dean Dumke
Cc: bct@freese.com
Subject: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading
Caleb will visit the site tomorrow, and we'll talk about it again after
that.
Keith
>>> "Dean Dumke" <deand@JRJPaving.com> 6/18/2010 5:23 PM >>>
Keith,
Is he going to revise the trees to be demo'd also? Since the area to be
cleared has decreased under the bridge, I need to demo the other trees
if possible. Since wall is moving the 2 in front of screening wall
should be able to be saved with wall tying into screening wall. Also,
the tree at the west side of Penfolds, Cedar Tree, - keep or remove.
Dean
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, June 18, 2010 3:45 PM
To: Dean Dumke
Cc: Larry Davis
Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading
For your use in clearing on Monday. Caleb will sign and issue this
sheet once he has worked out the wall issues.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>>
Forgot the attachment.
(8/13/2010) Keith Marvin - RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Caleb Thornhill
Sent: Friday, June 18, 2010 1:50 PM
To: 'Keith Marvin'
Cc: Engineer
Subject: Bethel Road II - Revised Bridge Rip Rap grading
Larry/Keith,
Here is the revised rip rap grading around the bridge. We've limited to
only underneath the bridge to eliminate channel regarding. Please
review and call me with any questions you might have.
I'm working with the contractor on the wall type and conflicts and I'm
trying to amend the wall lengths. Once those are determined, I will
reseal this sheet with the correct wall information on it.
Call me if you have any questions.
B. Caleb Thornhill P.E.
Project Manager
[cid:image001.jpg@01CB0EED.207704A0]
Freese and Nichols, Inc.<http://www.freese.com/>
* Main: 214-217-2200
* Direct: 214-217-2282
* Fax: 214-920-2565
* Email: bct@freese.com<mailto:bct@freese.com>
________________________________
This electronic mail message is intended exclusively for the individual
or entity to which it is addressed. This message, together with any
attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the
information as confidential and privileged and to not disclose or use
the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure,
distribution, retransmission, dissemination or other use of, or taking
of any action in reliance upon, this information by persons or entities
other than the intended recipient is prohibited. If you received this
message in error, please immediately contact the sender by reply email
and delete all copies of the material from any computer. Thank you for
your cooperation.
(8/8/2011) Keith Marvin - Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1
From: Keith Marvin
To:deand@JRJPaving.com
Date: 6/18/2010 4:58 PM
Subject: Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading
fyi...
>>> Caleb Thornhill <bct@freese.com> 6/18/2010 4:55 PM >>>
Keith,
We decreased the riprap area to 480 sy. Based on this area, the quantity for 5" concrete riprap should be 67 cy.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, June 18, 2010 4:30 PM
To: Caleb Thornhill
Subject: Fwd: RE: FW: Bethel Road II - Revised Bridge Rip Rap grading
Do you have any quantities for this change?
>>> "Dean Dumke" <deand@JRJPaving.com> 6/18/2010 4:31 PM >>>
Keith,
Can the engineer provide some quantities that changed on this? If we
could get the difference from original bid, I could get this back to you
faster.
Dean
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, June 18, 2010 3:45 PM
To: Dean Dumke
Cc: Larry Davis
Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading
For your use in clearing on Monday. Caleb will sign and issue this
sheet once he has worked out the wall issues.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>>
Forgot the attachment.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Caleb Thornhill
Sent: Friday, June 18, 2010 1:50 PM
To: 'Keith Marvin'
(8/8/2011) Keith Marvin - Fwd: RE: RE: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2
Cc: Engineer
Subject: Bethel Road II - Revised Bridge Rip Rap grading
Larry/Keith,
Here is the revised rip rap grading around the bridge. We've limited to
only underneath the bridge to eliminate channel regarding. Please
review and call me with any questions you might have.
I'm working with the contractor on the wall type and conflicts and I'm
trying to amend the wall lengths. Once those are determined, I will
reseal this sheet with the correct wall information on it.
Call me if you have any questions.
B. Caleb Thornhill P.E.
Project Manager
[cid:image001.jpg@01CB0EED.207704A0]
Freese and Nichols, Inc.<http://www.freese.com/>
* Main: 214-217-2200
* Direct: 214-217-2282
* Fax: 214-920-2565
* Email: bct@freese.com<mailto:bct@freese.com>
________________________________
This electronic mail message is intended exclusively for the individual
or entity to which it is addressed. This message, together with any
attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the
information as confidential and privileged and to not disclose or use
the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure,
distribution, retransmission, dissemination or other use of, or taking
of any action in reliance upon, this information by persons or entities
other than the intended recipient is prohibited. If you received this
message in error, please immediately contact the sender by reply email
and delete all copies of the material from any computer. Thank you for
your cooperation.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message,
together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient
is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as
authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution,
retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation.
(8/13/2010) Keith Marvin - FW: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 1
From:
"Dean Dumke" <deand@JRJPaving.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>
CC:
<bct@freese.com>, "Butch Cross" <butchc@JRJPaving.com>
Date:
6/18/2010 4:33 PM
Subject:
FW: FW: Bethel Road II - Revised Bridge Rip Rap grading
Attachments:
CV-ALL-PL-GRAD-LAYOUT-1.pdf
Caleb,
I need the revised CAD on these changes today. We are starting
excavation on Monday. Can you send to me by end of day today?
Dean
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Friday, June 18, 2010 3:45 PM
To: Dean Dumke
Cc: Larry Davis
Subject: Fwd: FW: Bethel Road II - Revised Bridge Rip Rap grading
For your use in clearing on Monday. Caleb will sign and issue this
sheet once he has worked out the wall issues.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Caleb Thornhill <bct@freese.com> 6/18/2010 1:50 PM >>>
Forgot the attachment.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Caleb Thornhill
Sent: Friday, June 18, 2010 1:50 PM
To: 'Keith Marvin'
Cc: Engineer
Subject: Bethel Road II - Revised Bridge Rip Rap grading
Larry/Keith,
Here is the revised rip rap grading around the bridge. We've limited to
only underneath the bridge to eliminate channel regarding. Please
review and call me with any questions you might have.
I'm working with the contractor on the wall type and conflicts and I'm
trying to amend the wall lengths. Once those are determined, I will
reseal this sheet with the correct wall information on it.
Call me if you have any questions.
(8/13/2010) Keith Marvin - FW: FW: Bethel Road II - Revised Bridge Rip Rap gradingPage 2
B. Caleb Thornhill P.E.
Project Manager
[cid:image001.jpg@01CB0EED.207704A0]
Freese and Nichols, Inc.<http://www.freese.com/>
* Main: 214-217-2200
* Direct: 214-217-2282
* Fax: 214-920-2565
* Email: bct@freese.com<mailto:bct@freese.com>
________________________________
This electronic mail message is intended exclusively for the individual
or entity to which it is addressed. This message, together with any
attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the
information as confidential and privileged and to not disclose or use
the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure,
distribution, retransmission, dissemination or other use of, or taking
of any action in reliance upon, this information by persons or entities
other than the intended recipient is prohibited. If you received this
message in error, please immediately contact the sender by reply email
and delete all copies of the material from any computer. Thank you for
your cooperation.
Page 1 of 1
Engineer - FW: Bethel Road II - Revised Bridge Rip Rap grading
From: Caleb Thornhill <bct @ free se. com>
To: Keith Marvin <kmarvin @coppelltx.gov >, Engineer <Engineer @ci.coppell.tx.us>
Date: 6/18/2010 1:52 PM
Subject: FW: Bethel Road II - Revised Bridge Rip Rap grading
Attachments: CV- ALL -PL -GRAD- LAYOUT -l.pdf
Forgot the attachment.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214 - 217 -2282
From: Caleb Thornhill
Sent: Friday, June 18, 2010 1:50 PM
To: 'Keith Marvin'
Cc: Engineer
Subject: Bethel Road II - Revised Bridge Rip Rap grading
Larry /Keith,
Here is the revised rip rap grading around the bridge. We've limited to only underneath the bridge to eliminate
channel regarding. Please review and call me with any questions you might have.
I'm working with the contractor on the wall type and conflicts and I'm trying to amend the wall lengths. Once
those are determined, I will reseal this sheet with the correct wall information on it.
Call me if you have any questions.
B. Caleb Thornhill P.E.
Project Manager
Freese and Nichols, Inc.
w Main - 214- 217 -2200
s Direct - 214- 217 -2282
s Fax 214- 920 -2565
® Email: bct _,freese.com
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file: HC: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4C 1 B7A08City_... 6/18/2010
STA 76+87.88, 22.00LT
0 10' 20' W.
.
"e �
\ J8 +8524, 22.00'Ri
STA J9 +90.61, 60.66LT
INSTALL 25' SGT
INSTALL (TL 2) TRANSITON
—
I MTV BEGIN TY C41I RAIL
BEGIN RETAINING WALL
57A J9 +80.59, 22.00' LT
INSTALL (R2) TRANSITION
w
o
0
—/�
_ — - -G— N= 70JJ49J85
E= 2429057.94
\
\ STA 8, 2200(7
INSTALL (TL2) TRANSITON
"'—
,
STA J9 +80.59, 22.001r
END FY I1 RAIL
NvS TALL SGT
LL SGT
`
I
AI
a ENO RETANING WALL
—
PP
"
,�
70P OF WALL =49814
—E E E
zP
BOTTOM OF WALL= 490.14
E
—7 _ _ E E
E
N= 70JJ534.91
E =2429175.59
37 +00
E E
lB +DO
'
- ulv RcROZv _
— — -
TELEPROIVE — —
- �/
STA J6 +87.88. 12.00OLT
BEGIN N C411 RAIL
BEGIN RETAINING WALL
TOP OF WALL= 498.J4
BOTTOM OF WALL -494..34
N= 7037558.57
E= 2428841.41 1 "a
/ I
_ w0
u
— ARKER-
II
t
It
N
z I--
J
2 –
F
�I
I
I
I
I
I
I
I
I
I
his 5
� BG
a rnz
0 10' 20' W.
.
"e �
\ J8 +8524, 22.00'Ri
azi
INS rs,
AVS7ALL 25' SGi
�EA o STA J9 +08.24, 22.00'Rr
—
I MTV BEGIN TY C41I RAIL
BEGIN RETAINING WALL
FOP OF WALL = 49721
BOTTOM OF WALL = 489.81
\
_ — - -G— N= 70JJ49J85
E= 2429057.94
\
STA J9 +08.24. 22.00'Rr
INSTALL (TL2) TRANSITON
1
1
L49709
WALL = 497.09
m�
BRIDGE GRADING AND GUARDRAIL
I
I N
Wy
Wo
�= o
Z
I Z g
I o n
I F-
I � J
V) 0
� Z �
a 0
o W �o
o p
- --- - - - - -- > p Z
a
J ()
� W Z
2
GR -1
SEO,
14 OF 80
0 10' 20' W.
I
SCALE
UNDERCROI
TELEPRO
ARK O
0
Q
NOTES:
1. SEE DT -1 FOR RETAINING WALL
ANO CY C411 CONFIGURATION
�L� W
I
Wy
Wo
�= o
Z
I Z g
I o n
I F-
I � J
V) 0
� Z �
a 0
o W �o
o p
- --- - - - - -- > p Z
a
J ()
� W Z
2
GR -1
SEO,
14 OF 80