2001
Change Order
PROJECT (Name and address):
Rolling Oaks Memorial Center
400 South Freeport Parkway
Cappell, Texas 75019
TO CONTRACTOR (Name and address):
The Fain Group
82S West Vickery
Ft. Worth, Tx. 76104
CHANGe ORDER NUMBER: 001
DATE: November 07. 2008
OWNER: 181
ARCHITECT: 181
CONTRACTOR: 181
FIELD: 0
OTHER: 0
ARCHITECrs PROJECT NUMBER: 0475 I
CONTRACT DATE: April 08, 2008
CONTRACT FOR: General Construction
THE CONTRACT IS CHANGED AS FOlLOWS:
(Include. wlu!n applicable. any undisputed amount attributable to previously executed Construction Change Directives)
I. Change Order Request 001: This includes cost increases due to the scope of work required for
one (I) fire hydrant addition as requested by the City of Coppell Fire Manhal.
$ 4,179.00
2. Ch8l1e Order Request 002: This includes cost decreases due to the scope of work eliminated
due to downsized mainline pipe dia. from 6" to 4" and relocation from below arterial concrete roadways
to back of curb.
<17,340.00:>
3. Change Order Request 003: This includes cost increases due to the scope of work
required due to the necessary extension of the existing Atmas Energy natural gas mainline from
the adjacent property to original point of service located within the Construction Documents.
12,971.00
Total Adjusted Amount
<$ 190.00:>
$ 2,94S,OOO.00
$ 0.00
$ 2,94S,OOO.00
$ 190.00
$ 2,945.190.00
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this OJange Order was
The Connet Sum will be inaeased by this OJange Order in the amount of
The new Contract Sum including this Change Order will be
The Contract Time will be unchanged by Zero ( 0 ) days.
The date of Substantial Complction as of the date of this Change Order therefore is March 20, 2009
NOTE: This Change Order does not include changes in the Contraet Sum, Contract Time or Guaranteed Maximum Price which
have been authori.zed by Construction Change Direalve until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER
J. Stuart Todd, Inc.
ARCtITECT (Finn 1Jilnte)
2919 Welborn
Daliu, Tx. 75219
~~k-.- ..l"ti\-
. t;;:~t"n)
Ken Baxter; Senior Project Manaller
(TYfNd name)
l\/~l/DeJ
DATE ·
The Fain Group
CONTRACTOR (Firm name)
825 West Vicltory
Ft. Worth, Texas 76104
ADDRESS
City of Coppe!I
OWNER (Firm rrame)
BY (Si'fUltu~)
Larry Fnzier; President
(Typed name)
Jim Win; City Manaller
~~
DATE
AlA ~ 0701" - 2001. CopyrIght 0 1m. 1\187,2000 end 2001 ~ The Americ:8n ...... 01 M:IlIIIdI. All rIghIs ~ WAltMNO: TN. All.-
Doc:um.lt .. proIICtId by U.s. Cop,rlght Law Md ..lIImMIo.... TrutIn. UMutIIarlzed reproduction or cIle1rIIutIon of 1ln AlA- 00cumenI, Of II'Y 1
por1lon of It, IIlIIy rnullln -- eM! end crlmlneI ......... ... wit be ~ to the _Imum elllMl pouIbIe under the.... Thla documInt .
- ~ by AlA BOftw-. at 12:08:41 on 1110712llOl1 under Older No. 1000324771_3 whlctI eIlpQI on 1/1512009. end.. not for.......
u.. HolM: (2195474010)
~~f