Loading...
ST0701-LR100624CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091193.0179 Nerracon Service Date: 05/26/10 8901 Carpenter Frwy. Report Date: 06/24/10 Revision 2 - 28 -day results Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client City of Coppell TX Attn: Keith Marvin PO Box 9478 Coppell, TX 75019 Project Southwestern Boulevard Coppell Road to Grapevine Creels Coppell, TX Project Number: 94091193 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: DCSOHSO4 Supplier: Redi -Mix Batch Time: 1218 Plant: 259 Truck No.: 1349 Ticket No.: 25204974 Field Test Data Test Slump (in): Air Content ( %): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Result Specification 4 3 -5 3.7 3 -6 93 87 151.2 Laboratory Test Data Set Specimen Diameter Area No. ID (in) (sq in) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Sample Information Sample Date: 05/26/10 Sample Time: Sampled By: Julio R. Perez Weather Conditions: Sunny Accumulative Yards: 5 Batch Size (cy): Placement Method: Direct Discharge Water Added Before (gal): 15 Water Added After (gal): 0 Sample Location: T E of W end of bridge Placement Location: Bridge Rail - West Bound 1310 Compressive Age at Maximum Date Date Test Load Received Tested (days) (lbs) 05/27/10 06/02/10 7 127,830 05/27/10 06/09/10 14 135,230 05/27/10 06/23/10 28 151,920 05/27/10 06/23/10 28 157,220 Average (28 days) 1310 Compressive Strength Fracture (psi) Type 4,520 4 4,780 4 5,370 2 5,560 2 5,470 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Julio R. Perez Started: 1200 Reported To: Finished: 1500 Contractor: Lacy Construction Report Distribution: (1) City of Coppell TX (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) Halff Assoc Inc Eric J. Cleveland, P.E. (1) Lacy Construction (1) PacTrust Pacific Realty Associates LP Senior Project Manager Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 4- 28 -10, Rev.4 Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94091194.0107 Irerracon Service Date: 05/26/10 8901 Carpenter Frwy. Report Date: 06/24/10 Revision 1 - 28 -day results Dallas, TX 75247 214 - 630 -1010 Reg No: F -3272 Client PacTrust Pacific Realty Associates LP Attn: Matthew Oyen 15350 Southwest Sequoia Pkwy Ste 300 Portland, OR 97224 Project Southwestern Boulevard Grapevine Creek to Beltline Road Coppell, TX Project Number: 94091194 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/26/10 Sample Time: 0740 Sampled By: Julio R. Perez Mix ID: 1701 Weather Conditions: Sunny Supplier: Lattimore Accumulative Yards: 30 Batch Size (cy): 4 Batch Time: 0649 Plant: 7 Placement Method: Direct Discharge Truck No.: 3012 Ticket No.: 7217270 Water Added Before (gal): 10 Water Added After (gal): 0 Field Test Data Sample Location: See Placement Location Test Result Specification Placement Location: Approach at 400 Southwestern Slump (in): 5 3 -5 Boulevard Air Content ( %): 4.3 3 -6 Concrete Temp. (F): 90 Ambient Temp. (F): 80 Plastic Unit Wt., (pcf): 146.4 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 1 6.00 28.27 05/27/10 05/27/10 1 93,570 3,310 5 1 2 6.00 28.27 05/27/10 06/02/10 7 124,720 4,410 4 1 3 6.00 28.27 05/27/10 06/23/10 28 151,680 5,370 2 1 4 6.00 28.27 05/27/10 06/23/10 28 144,150 5,100 2 Average (28 days) 5,240 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Julio R. Perez Started: 060( Reported To: Finished: 120( Contractor: Lacy Construction Report Distribution: (1) PacTrust Pacific Realty Associates LP (1) City of Coppell TX Reviewed By: (1) City of Coppell TX (2) HalffAssoc Inc (1) Lacy Construction Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CROOO1, 4- 28-10, Rev.4 Page I of 1