Loading...
SS9402C-CS 960718Mr. Doug Bisballe, Vice President Pate Brothers Construction, Inc. 780 West Mansfield Hwy. Kennedale, Texas 76060 P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 18, 1996 RE: Bethel Road Sanitary Sewer Project SS 94-02C Dear Doug, In response to your letter dated July 11, 1996, I submit the following: Grapevine IV and Bethel Road is all one project. The only section that is fmaled is from Freeport Parkway, Sta. 42+52 to the west to Sta. 74+72 or 3,220' minus 500' as agreed upon, a total of 2720' of 10" PVC. This final includes all items associated with that 2720', plus $4,000.00, a previously agreed upon amount that allowed for the accept_ance of that section of the project as completed. Of the 2720' of pipe, 200' is 0'-10' bury and 2520' is 10'-15' bury according to the cutsheet and plans. There are manholes at Stations 47+27, 52+22, 57+16, 61 +54, 63 +66, 68 +32, 72 + 86 and 74 +72 (eight manholes, seven 4' and one 4' drop). There was one C.O. abandoned at Sta. 46 + 80. Also, included is 2720' of trench safety and 43 % of traffic control. Bethel Road Sta. 0-08 to Sta 42+52, includes 12" from 0-08 to 0+40 (48') from 1+62 to 35+40 (3378) for a total of 3426', and 10" from Sta. 35+40 to 42+52 or 712'. Enclosed for your review is a breakout of these items on our standard estimate form. I hope this information is helpful. I acknowledge that a walk thru has been done on the section from Sta. 0-08 to Sta. 42+52 and a punch list was generated. However, not all the items on the punch list have been resolved. Once all the punch list items are resolved, that portion will be considered to be complete, but the retainage will not be released until Grapevine IV is completed and accepted. I would like to also take this opportunity to inform you that the pavement over the ditch line is continuing to settle in some areas. After you have had time to review this information and compare these quantities with yours, I will be happy to discuss any differences with you. I am including for your execution a change order for the extra depth sewer installation and for the extended traffic control. In the meantime, if you have any questions please give me a call at (214) 304-3685. Construction Inspector CITY OF COPPELL P.O. BOX 478 COPPELL, TEXAS 75019 Quantities total up to Pay Estimate No. 4 Pr0|ect: Bethel Rd. S/S lmgrovements Sta 42+52 to Sta 74+72 FUnd: 21 Original Contract Amount: Plus Change Orders: N/A Value of Work to Date: I~m UNIT No. DESCRIPTION OF MEASURE 1 6' Cl.50 D.i. Pipe LF 2 8' C1.50 D.!. Pipe LF 3 8' PVC (0'-i0' depth) LF 4 8' PVC (lO'M5' depth) LF 5-6 NA 7 10' PVC (0'-10' depth) LF 8 10' PVC (10'-15' depth) LF 9 12' PVC (0~-5' depth) LF 10 12' PVC (5~-10' depth) LF 11 12' PVC (10'-15' depth) LF 12-18 NA 19 Standard 4' MH EA 20 Standard 5' MH EA 21 NA 22 4' Drop MH EA 3 5' Drop MH EA 24 NA 25 5' Type'S' MH EA 26 Siphon Structure EA 27 20" Dry Bm LF 28 20~ C~s}ng LF Period: 4-1 _ot~ tn ~_~ ~ _on Contractor: pnt~ Rrnth~.r~ (Tnnetrnetlnn Iht_ Address: 7aC~ W M:met'i~lcl l-Iwy Original Contract Time: 1 $n ~n With Adjustments: NA Time Charged to Date: NA UNIT ORIGINAL QUAN'ITYY VALUI~ OF PRICE ESTIMATED COMPLI~-I'~ COMP~ BID QUAN'ITrY TO DAT~ WORK 30.04 110 4}- 34.99 110 -0- 45.80 13 4}- 45.80 5 4}- 22.84 2314 200 24.65 1648 2520 27.44 15 4}- 23.02 892 -0- 24.49 2477 4}- 2,031.31 13 7 2,859.76 2 4}- 2,904.83 4 1 3,898.08 1 4}- 2,892.29 1 -0- 16,168.70 1 -0- 575.11 15 4}- 22.55 15 4}- Page 1 Periodical Estimate No. Sta 42+52 to Sta 74+72 Period: Project: gg oa-a~c ITEM UNIT UNIT NO. DESCRIPTION OF PRICE MEASURE BID 29 Abaondon existing MH EA 405.96 30 Abaondon existing CO EA 101.49 31 6" CI 'B' Embedment LF 16.01 32-35 NA 36 R&R 6" Rip Rap SY 84.33 37 Replace Landscaping LS 6,202.16 38 Trench Saftey LF 7.54 39A Traffic Control LS 5,074.49 39B Traffic Control LS 7,893.66 40 4" PVC Services Ea 442.52 ti. ! .Q~ tn ORIG~AL ESTIMATED ~UANTITY 6 48 COMPLETED TO DATE -0- 1 7 -0- 1 -0- 7346 2720 1 .43 1 .43 18 -0- VALUE OF COMPLETED WORK Remarks: This represents bid items west of Freeport (Sta 42+52 to Sta 74+72). Refer to Pay Estimate No.4 for total of bid items and value of work completed for project. Page 2