Loading...
ST0301A-CR100614T H E C I T Y - O F COPPELL r o PROJECT: W. BETHEL ROAD OVERCAST (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase H -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY DAY SUN CI.E OVERCAST RAIN SNOW To 32 32 -50 50-70 70-85 85 up Still Mod High Report No Dry Mod Humid M W T F S S AVERAGE FIELD FORCE NAME OF CONTRACTOR MANUAL VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS Pea EQUIPMENT AT THE SITE: CONSTRUCTIPN ACTIVITIES: I' rCU // e !/ ,ae ik-e r ee d �, SIGN DEPT. INSPECTOR