Loading...
ST0301A-CR100626T H E - C 1 T Y O F COPPELL T � o F X A S 1 8 9 PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL AVERAGE FIELD FORCE NAME OF CONTRACTOR NON- MANUAL MANUAL REMARKS VISITORS TIME REP RES NTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: 1 NGINF.ERING DEPT. INSPECTOR CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY SITN CLE OVERCAST RAIN SNOW To 32 32 -50 50 -70 70 -85 85 up Still o High Report No Dry o .amid i DAY [M � T � W � T F S 9