Loading...
SBC-CS040220 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Lisa Cantu - SBC Communications From: Keith Marvin, P.E. Date: February 20, 2004 RE: SBC Service to CiCi’s Pizza on Bethel Road The City of Coppell has reviewed the plans submitted for the ROW Use Permit Application for the above referenced project. The permit application is approved with the following additional requirements: 1.Ensure the contractor verifies the depth and location of all City–owned as well as franchise utilities prior to beginning excavation or boring across or adjacent to them. 2.Adjust the location and length of bores as necessary to avoid driveways, trees, and landscaping during construction. 3.Adjust the conduit(s) depth such that the minimum 48” cover is provided under the proposed future grade after the Bethel Road reconstruction. I have provided plans and cross sections for your use in determining the appropriate depth of cover. 4.Anywhere the contractor needs to cut City of Coppell pavement, they must do a full-depth saw cut prior to removal. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"