Loading...
SS9402C-CS 960507 (3)CONSTRUCTION, INC. May 7, 1996 City of Coppell 255 Parkway Coppell, Texas 75019 RE: Bethel Road Sanitary Sewer ATTN: Ken Griffin Dear Ken: The problem we discussed this morning is sticky at best. We would like to help the City resolve this and we are willing to help the City of CoDpell in any way possible. We will install the 15" sewer from station 42+52 on Bethel Road for the following costs: 3200 LF± 2 EA 7 EA 7 EA 3200 LF± 1 LS 24 DAY 1 LS 15" PVC Sewer New 4' Dia. Manhole New 4' Dia. Manhole Base $ Remove/Replace 4' Dia. MH $ Trench Safety $ Traffic Control (Sewer Inst.) $ Traffic Control (County Rd.- Maximum 24 days) $ Survey $ 37.12 LF = $118,784.00 $2,574.46 EA = $ 5,148.92 450.00 EA = $ 3,150.00 500.00 EA = $ 3,500.00 4.10 LF = $ 13,120.00 800.00 LS = $ 800.00 100.00 EA = $ 2,400.00 $1,750.00 LS = $ 1,750,00 $148,652.92 This price is based upon being paid in full on the existing 10" line that we installed minus the $8,000.00 credit for grade error. Also, we are looking for payment of barricades as outlined in an earlier letter. The pavement replacement, as I understand, is across Treeport Parkway. If this is disturbed in relaying ~this sewer, we will not be responsible for the replacement of the HMAC or subgrade. All spoil will be taken to the site which was previously designated and used for previous construction. OFFICE (817) 483-0999 KENNEDALE, TEXAS 76060 FAX (817) 483-0899 ................................................................................. ............................ 780 WEST MANSFIELD HIGHWAY If we need to relay the 10" line, we will do so at the original plan grade. If you have any questions, please contact me. Sincerely, p~~ROTHE~~TRUCT ION,~ Dougl~sBisbal le Vice President INC.