Loading...
Time Warner-CS030827 PERMIT APPLICATION COMMENTS FROM THE DEPARTMENT OF ENGINEERING To: Kevin Mullaney, ComCast – fax (214) 320-7559 Darren Peoples, Southwest Telecom, Inc. From: Teresa Turner, E.I.T., Graduate Engineer Date: August 27, 2003 RE: Right-Of-Way Use Permit Application Bethel Road at Harris Road 1.You must receive permission from the owner to enter upon private property to remove the existing utility poles. Please provide written verification that the owner has seen and approved this proposed relocation. 2.A traffic control plan was submitted along with the permit application. Are you proposing to require lane closures? If so, indicate where. 3.The drawings must show the entire extent that you will be working. It is difficult to determine from the drawings specific starting and ending points for the project. Please clarify and include an overall area map. 4.FYI – when this property develops it is likely that this cable will need to be relocated. It may be more feasible to work with the current property owner to investigate options taking into account any possible future development. 5.Sheet 3 has the street labeled as Harris. Is this correct? If you have any questions, please contact me at 972-304-3681. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"