Loading...
Verizon-CS050503 May 3, 2005 Paul Bowles Verizon Communications 750 Canyon Drive Coppell TX 75019 Request for Variance to 5-Foot Minimum Separation from City Utilities RE: Dear Mr. Bowles: The City of Coppell Engineering Department will allow a minimum separation of three feet from sanitary sewer lines, however we will not grant a variance from the five foot minimum separation of your installations from City water lines. Additionally, if we feel your contractors have deviated from the three foot separation, we may require the contractor (at his own expense) to televise that portion of the sewer line to inspect for damage. Be advised that if City crews need to make emergency repairs to our facilities in the future, this deviation in separation may result in damage to Verizon facilities during any such repairs. If you have any questions or want to discuss the matter further, please contact me at your convenience. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office: 972-304-7044 Fax: 972-304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Assistant Director of Public Works Larry Davis, Construction Inspector Johnny Hester, Verizon Jack Dwyer, Ameriss