Loading...
MA1001-CS100510 (2) (6/29/2010) George Marshall - RE: MA10-01 DT&SL IntersectionPage 1 From: "Bill Asher" <basher@nema3electric.com> To: "George Marshall" <gmarshall@coppelltx.gov> CC: "Ricky Cooper" <RCooper@nema3electric.com> Date: 5/10/2010 10:45 AM Subject: RE: MA10-01 DT&SL Intersection George, Just to let you know - Larry Redick got back with Mike Friday regarding our request to use Rigid Galvanized Conduit in order to have a trench depth of only 8". However, per Larry, Oncor will require the 24" deep trench and PVC conduit. Due to the trench depth and the number of trees as well as utilities along the path of the trench, we believe that boring is required to help protect the trees and to lessen the possibility of severing underground utilities. I hope to have you a cost for the jobs as soon as we have an estimate back from a contractor for the bore. Is there an easement that the electrical underground will need to stay within? Thanks, Bill Asher Nema 3 Electric, Inc. 972-723-1180 -----Original Message----- From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Thursday, May 06, 2010 8:19 AM To: Bill Asher Subject: RE: MA10-01 DT&SL Intersection Bill, Could you pass this along to Mike... I just spoke with Larry Redick with Oncor Cell 972-890-3479. He mentioned that the conduit will need to be 24" deep to the top of the conduit. It would not hurt to contact him to discuss. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562 >>> "Bill Asher" <basher@nema3electric.com> 5/5/2010 11:13 AM >>> Will do! -----Original Message----- From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Wednesday, May 05, 2010 10:14 AM To: Bill Asher (6/29/2010) George Marshall - RE: MA10-01 DT&SL IntersectionPage 2 Subject: MA10-01 DT&SL Intersection Mike, Please find attached a pdf of the design plans. I was talking this over with some folks in the office and they mentioned that Oncor would typically run the cable to the new meter but we would need to run the conduit. So I think we would need a itemized/detailed bid. If you have any other questions please contact me. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562