George Marshall - RE: FW: Denton Tap Sidewalk Project
From: "Greg Yancey" <gregyancey@verizon.net>
To: "'George Marshall'" <gmarshall@coppelltx.gov>
Date: 5/25/2010 5:37 AM
Subject: RE: FW: Denton Tap Sidewalk Project
Yes, got their attorney’s approval yesterday. Now it’s on to the lender.
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Monday, May 24, 2010 3:20 PM
To: Greg Yancey
Subject: RE: FW: Denton Tap Sidewalk Project
Greg,
Any news on the easement?
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Greg Yancey" <gregyancey@verizon.net> 5/8/2010 6:50 AM >>>
Hi George:
The church is fine with this, but asked if you could provide a plot of the
drawing large enough for us to read?
If you could print it, I'll come by city hall on Monday and pick it up.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 2 of 7
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Tuesday, April 27, 2010 4:17 PM
To: Greg Yancey
Subject: RE: FW: Denton Tap Sidewalk Project
Greg,
I know it was awhile back that we met to discuss your concerns with the
proposed sidewalk & easement. I have been trying to work on a few other
projects but now I am back on the sidewalk. We had discussed the drainage
issues along the north portion along the back of the existing inlet. I
mentioned that we would have our contractor re-grade the area between the
sidewalk & flower bed including a portion of the flower bed because it
seemed a little low. We will not cause drainage problem for your site. As
it is, we will need to reset the water meters which will require more
grading in that area than if there were no meters.
The easement document includes basic language that requires the City to
restore the land back to original condition. "GRANTEE shall, except for
removed obstructions, return the surface area of the Easement to its
original condition as nearly as practical taking into consideration the
nature of the work being performed"
If you need anything further please let me know.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Greg Yancey" <gregyancey@verizon.net> 3/3/2010 8:43 AM >>>
See you there
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Wednesday, March 03, 2010 7:59 AM
To: Greg Yancey
Subject: RE: FW: Denton Tap Sidewalk Project
2 will work great!
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 3 of 7
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Greg Yancey" <gregyancey@verizon.net> 3/3/2010 6:01 AM >>>
How's 2:00 today?
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Monday, March 01, 2010 4:38 PM
To: Greg Yancey
Subject: Re: FW: Denton Tap Sidewalk Project
Greg,
I would like to meet up with you onsite and discuss this further. Please
let me know when might be a good time to meet. Hopefully when it isn't
raining like it has been.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Greg Yancey" <gregyancey@verizon.net> 2/27/2010 9:15 AM >>>
I think this is still where we are.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: Greg Yancey [mailto:gregyancey@verizon.net]
Sent: Thursday, August 13, 2009 4:33 PM
To: 'DiWanna Baskins'
Subject: RE: Denton Tap Sidewalk Project
Hi:
It looks like the plan works fine except the north portion. As shown, the
walk is immediately adjacent to the new planter.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 4 of 7
What is the anticipated final elevation of the walk? If it is supposed to
match the curb elevation, I think we may still have a problem.
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us]
Sent: Monday, August 10, 2009 9:36 AM
To: Greg Yancey
Subject: RE: Denton Tap Sidewalk Project
Hi Greg!
We have relocated the sidewalk further towards the curb to accommodate all
aspects. I have also attached a revised easement document that will better
reflect your concerns.
Let me know your thoughts on this.
Sincerely,
DiWanna
>>> "Greg Yancey" <gregyancey@verizon.net> 7/24/2009 12:39 PM >>>
Hi DiWanna:
I took your latest plan to the site today and I can't get the same answer as
the drawing shows. The attached photos show where 10'6" actually lands back
of curb. As you can see, the walk lands against the landscaping we just
installed.
The existing church walk at 590 is only 9'8" back of curb.
I understand why the City wants to move pedestrians safely away from traffic
and appreciate the offer to install the walk. We just need to get a better
understanding of how this can be achieved without a drastic grade change at
the edge of our new planters or a drainage problem.
I understand TDLR cross slope issues that create challenges for the designer
and contractor, so I'm unclear as to how this is going to work with the
planter. We just finished the planter renovation three months ago.
Could you please take another look at this for us?
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 5 of 7
(214) 276-1709 f
gregyancey@verizon.net
-----Original Message-----
From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us]
Sent: Wednesday, July 22, 2009 4:22 PM
To: gregyancey@verizon.net
Subject: Denton Tap Sidewalk Project
Hello Greg,
I have attached two pdf's showing the sidewalk location. The first drawing
is the drawing that we send to the contractor. The second drawing shows a
closer view of the placement of the sidewalk, shown hatched.
The sidewalk will look exactly like the sidewalk that is adjacent to this
property. (590 Denton Tap)
Sincerely,
DiWanna Baskins
Graduate Engineer
Engineering Department
(P)972-304-3562
(F)972-304-3570
__________ NOD32 4267 (20090722) Information __________
This message was checked by NOD32 antivirus system.
http://www.eset.com
__________ NOD32 4323 (20090810) Information __________
This message was checked by NOD32 antivirus system.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 4900 (20100227) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 4906 (20100301) __________
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 6 of 7
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 4911 (20100303) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 4911 (20100303) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 4911 (20100303) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 5066 (20100427) __________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature
database 5096 (20100507) __________
The message was checked by ESET Smart Security.
http://www.eset.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010
Page 7 of 7
__________ Information from ESET Smart Security, version of virus signature database 5142 (20100524)
__________
The message was checked by ESET Smart Security.
http://www.eset.com
__________ Information from ESET Smart Security, version of virus signature database 5143
(20100525) __________
The message was checked by ESET Smart Security.
http://www.eset.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BFB6223City_...6/29/2010