Loading...
WA9601B-CS 990521 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOB& P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JoE R. CAR,~R, P.E. May 21, 1999 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Transmitted Via Facsimile Fox Con ctors, Inc. Post ~ce Box 951 · ' , s 76065 Re: City of Coppell Sandy Lake Road Water Line Gentlemen: We are enclosing preliminary copies of Change Order Numbers 2 and 3 to your contract with the City of Coppell for the construction of the Sandy Lake Road Water Line Project. You came by our offices earlier today to pick up the revised construction plan sheets associated with these changes. These change orders are initiated by the City of Coppell and cover the following additional work: Changer Order Number 2: Covers the extra work required to furnish and install approximately 48 linear feet of 24-inch water line and make the necessary connections to the existing distribution system including all closures, fittings and appurtenances, complete in place. The attached revised construction plan sheet number 11 shows the extra work covered by this change order. Change Order Number 3: At the request of the City of Coppell, the alignment of the 24-inch water line from Station 2+15.30 (Start) to Station 45+49.73 (State Road) is to be revised as shown on revised construction plan sheets 1A through 5. The revised sheets are marked with "Change Order Number 3" along the lower border and are hereby made a part of this change order by reference. As a result of the re-alignment, the project quantities are revised as shown in Section C the change order. At this stage, we have prepared the preliminary copy of Change Order Number 3 utilizing the established contract unit prices. However, the City recognizes the current unit prices may not be applicable to this new scope of work. \\engineering\sjf-sjf-v~~2sjt'Xpr~jects\c~erica~\c~ppe~~\96~~5~\~~tters\c~nst~k\c~-2&3ltr~d~c Fox Contractors, Inc. Changer Order Numbers 2 and 3 May 21, 1999 Page Number 2 Please review the extra work covered in these changer orders and submit your proposal. It is important to know that depending on the amount, Change Order Number 2 could possibly be approved at the staff level, thus expediting the changer order. Change Order Number 3 will most likely require City Council approval and is not expected to be considered until the June 8th meeting. For that reason, we separated the extra work into two separate change orders. However, we request that your proposal for both change orders be submitted for our consideration no later than Tuesday, May 25th. If you have any questions or need additional information, please do not hesitate to contact this office. Sincerely yours, Gary C. Hen~c s~,P.E. Enclosures cc: ~rr..Kenneth M. Griffin, P.E. Larry Davis --- --~ CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 2 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE The original plans for this project called for the water line to terminate at Station 117+86.74 with a 24-inch dished head plug on the east side of Denton Tap Road. The City of Coppell has requested that the contractor make the connection to the 24-inch water line in this same vicinity currently under construction by others. This change order covers the extra work required to furnish and install approximately 48 linear feet of 24- inch water line and make the necessary connections to the existing distribution system including all closures, fittings and appurtenances, complete in place. The attached revised construction plan sheet number 11 shows the extra work covered by this change order. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Description Previous Quantity Revised Unit Unit Price Amount of Change No. Quantity This Quantity Change Order 1 24" Water Line including 8,533 48 8581 L.F. $59.50 $ 2,856.0C Embedment 42 Remove existing 24-inch plug and 0 1 1 L.S. connect to existing 24-inch water line, complete in place including all necessary closures, fittings and appurtenances 43 Remove existing 6-foot storm sewer curb 0 1 1 L..S. inlet and raplace, complete in place Total Amount of Change: $ Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Change Order No. 2 Revised Contract Amount j:\clerical\coppellX96-150~specs\change-o\co-2.doc (May 21, 1999) Page 1 of 2 B. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Change Order No. 2 0 calendar days Revised Contract Time 200 calendar days C. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 2 to the original contract between themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: j:\clerical\coppell\96-150Xspecs\change-o\co-2.doc (May 21, 1999) Page 2 of 2 CONNELL SKAGGS ADDfflON .~J CONNE~ S~S ADDfflON LOT ~ 20 ~ ~C~ · ~ = 1~'1~" Zr 19970. I7~ ~ E I992~07~ ~ ~ & INST~ · 1994~1 E 197~.78~ ~ D.W. 2-2C D.W. ~ ~ ff D.W. .... ~ MX 2J ~ g ~ · ~ON ) )DY ~KE CROSS~NO S~DY ~KE CROSS)NG LOT 1 LOT 2 ~ RE~ C~GE NO, I J/24/99 T.B.M.~ ~ ~ P.P. ~w~ ~ d ~ St~ ~ RE~ C~GE NO. 2 4/1/99 ~ ~ of ~ ~ d ~ ~ R~ ~ RE~ C~CE NO. 2 5/21/99 495 '..,,T.S. BOX~ \ CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PRORLE STA, 110+00 TO STA. 117+88.56 SHIMEl(, JACOBS &: RNKLEA, LLP. CONSULTING ENGINEERS OE:SIGNE]) e~. G.C~ ~ PRO, ECT: 961~0 ~ 110+00 111 112 113 114 115+00 116 117 118 I DRASN an. SJ. & F. ;^~ 0CT0eB, t998 <~ 11 CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 3 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE At the request of the City of Coppell, the alignment of the 24-inch water line from Station 2+ 15.30 (Start) to Station 45+49.73 (State Road) is hereby revised as shown on revised construction plan sheets 1A through 5. The revised sheets are marked with "Change Order Number 3" along the lower border and are hereby made a part of this change order by reference. As a result of the re-alignment, the project quantities are revised as shown in Section C of this change order. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Description Previous Quantity Revised Unit Unit Price Amount of Change No. Quantity This Quantity Change Order 1 24" Water Line including 8581 (646) 7,935 L.F. $59.50 $ (38,410.82~ Embedment 2 24" Water Line by other than Open 292 157 449 L.F. $265.00 $ 41,605.0C Cut 3 24" Waterline w/36" 3/16" Thick Steel 189 468 657 L.F. $300.00 $ 140,400.0C Encase. Pipe 7 12" PVC Waterline with 304 (54) 250 L.F. $27.00 $ (1,458.0ff, Embedment 10 6" D.I.P. Water Line with 74 25 99 L.F. $22.00 $ 550.00 Embedment 12 12" Gate Valve 5 (1) 4 Ea. $1,000.00 $ (1,000.00) 13 8" Gate Valve 8 1 9 Ea. $600.00 $ 600.00 14 6" Gate Valve 4 (3) 1 Ea. $480.00 $ (1,440.00) 15 8" x 8" Tapping Sleeve and Valve 5 1 6 Ea. $1,900.00 $ 1,900.00 16 12" x 12" Tapping Sleeve and Valve 1 (1) 0 Ea. $2,700.00 $ (2,700.00) 18 3" Air &Vacuum Release Valve 4 (1) 3 Ea. $3,500.00 $ (3,500.00) 19 6" Blow-Off Valve 4 I 5 Ea. $2,000.00 $ 2,000.00 28 Asphalt Pavement 315 135 450 S.Y. $32.00 $ 4,304.00 Total Amount of Change: $ 142,850.18 j:\clerical\coppell\96-150~specs\change-o\co-3.doc (May 21, 1999) Page 1 of 2 Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Change Order No. 2 Change Order No. 3 142,850.18 Revised Contract Amount $1,072,593.68 B. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Change Order No. 2 0 calendar days Revised Contract Time 200 calendar days C. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 3 to the original contract between themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: j:\clerical\coppell\96-150~specs\change-o\co-3doc (May 21, 1999) Page 2 of 2 O©BSTBUOTH©I PLAB8 SANDY LAKE ROAD WATER LINE FROM: WAGON WHEEL RANCH ELEVATED STORAGE TO: DENTON TAP ROAD Projecf No. 96-01A (~ BID NO. Q 1098-01 The City With A Beautiful Future CITY COUNCIL SHEET INDEX Candy Sheehan, Mayor SHEET NO. SHEET DESCRIPTION Marsha Tunnell, Mayor Pro-Tam Norman Alexander ,- Danny Watson Town cs. fB Lanny Mayo Chuck Sturges Larry Wheeler ,aTe, 6 PLAN-PRORLE STA. 55+00 TO STA. 66+00 - O LE S A. 66+00 TO STA. 77+00 Bill York ""=" 11 PLAN-PRORLE STA. 110+00 TO STk 117+86.74 CITY MANAGER ~ Jim Witt J DETAILS - CITY OF COPPELL STANDARD CONSTRUCTION DETAILS DEPUTY CITY MANAGER ~. L~O. Clay Phillips ~'~ ~1 NOTE..'  To mills PROJECT ONLY AND IS NOr BASEl7 ON mite IDfA~ PI, t~E COORDINATE SYSTEM OR ANY orttB, CITY ENGINEER Esr~Llstte sYsIBI. Kenneth M. Griffin, P.E. LOCATION MAP REVISED ALIGNMENT 5/12/99 SHIMEl(. JACOBS & RNKLEA. LLP. THBE Dec rO, ~. CONSULTING ENGINEERS BID01NG, ON. MAY, 1999 DAlIE: ~ ~i JOSE A. ESTEVE V0L 89099, PG. 757 P.I. STk 1+08.59 A = 9'32'03' LT. BEGIN THIS PROdECT R~O~ ~'IST 24" P~UG P.I STk I+75 OON~E~T TO ~S~NG ~ = 9"4~'49" RT, 24' WA~'R UNE N 18260,3065 PROP~TY UNE N 18244,4292 E 11388,8959 NO~ NO. E 11324,4161 .C~ 12° Ok~ ;~-8' g--~. NORTHPOiNT DP,~E OAK __ 12'__ r- ~ 12' W.L OAK i8' OAK _l ~; 20' OAK 18' OAK 18° OAK! 20' OAK / ,2. + ~. A/.L Wt~K IS 7'(2 BE CONfiNED TO THE S0~17t S/DE OF P./. ST.4. 4+26.25 THE PROPER77 L/NE ON THE C/'/7 OF COPPE~ PROPEt?TY. WAGON WHEEL A = ,P54~22' ~7:. THE CJTY HAS NOT ARRANGED FOR TEMPORARy ACCESS TO __ ~'~/AT~ TAHK N 18278. 1374 mE AOdAC~vr pRopEen, romE NORm, (~ o~) C~TY OF COPPE~_ E 11639.SI~ __ CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE 3 PLAN-PROFILE  STA. 1+08.59 TO STA, 5+00 ~ ~J~ SHIMEK, JACO~S & RNKLEA. LLP. ENOINEERS Di~Q.E~ eY: C,.C.H. I Pf~,~cl':, 96150 CF 51Ams~"m I X X X X X X · 0-t-00 1 2 ..... ImAm eY: S, J. & F. DAle MAY~ 1999 I SU'q~mNION'q ONmm-h"lSNOO ( d ONV 'd'l"l 'V'JlMNL-I I' SS03Vr ':)EIIqlHS ~ 6/~| t{J [~ ~ oo+gvvzs o~ oo+g ~s ,~ ~' ~ ~...,r~ ms~,. ~7 g. r. ~ 3NIl ~131VtA aVO~l 3)IV'i kONVS '-" c-~ SVX31 "l'13ddOO :10 AllO ~; ' [ °el 9t O0.~t .L,,A ~ ~D~ 00~ ~ 1"'1~ '~. ,~e. ,,,~ ,, , i c:joc~ t~.~..._.,,, ""'--.:~-...~,~ '-- _._..~ ,, ....... . i,,. j L/,/ , ~oc:j.,, °'~............. '~-~ ~ t ' ~ i ' o,~ '~-L_ t ~ J,,- /L- t ~I~ON 3tll Ol MgJdO, Yd ~ IISOH~t 3ttl O~ SStOOV ,~Va~dlllZ ~OJ OtQNYd~W ION SHt  ~ 3Nl ~la~O&d TgddOQ tO )JD 3Nl NO 3NI7 /.61, 'Od 't9t96 'qOA 3HL ~O 30Z~ fiXmS 3m aL O]NHNO~ ~ C~ S/>/~/O/a TW 'l '"'" '~'" 'l'13ddO0 JO k, LlO .azou 9~l 'gO~gl It C) ~7 .Zl, g~'Z = ~ I'~ ("} m O0+OI Y~S 7W [ ~aa ~ j,N,,,,~ 8'1'66 ,q VIS + ! , ! .... ,-- y r~ "D '"'" , , , , t ~ , O0+ ;l t l Cl t/ 11 O0;Ol 6 tn O i. i 9n9o',/~/ N :~ ~} ~ O 9lB~"ZC~gl 3 ' let .~,99a'.9 = ~ ,~. -4 SA~A 3SrSBU ~1 LtDBOVA ~ 8IV .C-I ZgL 'Od '66069 qOA 77v. zsu/,,-$ HSIN6'I'H 3A3/S3 'V 3SOP g+o/Y. zs SAH. SEW. M.H. R1M 492,70 F.L 4-79.40 MATCH LINE STA. 26+00 N 18646.0160. 1,5644.6737 P.L 57X 20-/-25 JOSE A. ESTEVE.~w wooos A ---- 2'I0'10' Rr. VOL 89099m PG. B,~ MRE O N 18473.,.5583 O E 13225.5396 + NO/T ~ I 12' ASH I '/~/'f' I4) BARB WIRE I 8)" BORING BARB WIRE Sr~ 25+ 11 ~ H~VY WO~S ~ m~CS _L~' ~ BEGIN BO~NG STA. 25+0O I" FURNISH ,~ INSTALL: (I) Y7 fa I9 1-24' B~Y VA~V~ b,I 8' B.T. Z s" PEc. 0 14-" CEdaR PJ. ST,~ 24+61,91 '~ lo' REC. 12" B.T. · CED~ t26' PEC. A = 92'09~6' LT. FURNISH · INSTALL' HEAW WOODS 1-24~r24~t12 -r 20 LF 12' W.L SOUTH <-) 1-12" GAT~ ~ REPLAC~ 1-12" PLUG l~ 106 ~Y. N 18508.8953 E 13861.0153 CRY OF COPPELL VOL 96164, PG, 197 ST/L 24+40 NOTE NO. FURNISH & IAISTAL~ FOR BORE PIT St~N, SEW, M.H. F~M 497.4-2 I -- 6° BLOWOFF VALVE' F.L ~2.62 NOTE' 8t ASSEMBLY 1. TIlE BORE PIT ACROSS STATE' ROAD SHALL BE COVERED 30 LF. 6' D.I.P. W.L WITH STE~Z P~A~TNG SUFFTClENT TO MAINTAIN AT LEAST I - 6" PLUG ONE LANE OF Tt~EF7C AT ALL ~TMES, 1-12' PLUG '~~ 'SAN..~'W. M.H. 2. ~ WORK IS TO BE COtVRNED TO THE SOUTH SIDE OF RIM ~88.51 THE PROPERTY UNE ON THE C/T( OF COPPELZ PROPERTY, F.L 4-76.85 THE CrD ' I-L4S NOT ARRANGED FOR TEMPORARY ACCESS TO 0 40 80 12o ~ __ I I I THE ADJACENt PROPERTY ro THE NORTH. HORIZONTAL I -- CITY OF COPPELL, PLAN-PRORLE CONSULTING ENGINEERS DATE: G.C.H, I R~O,~CT: 96150 ~ 16 17 18 19 20'1"00 21 22 23 24 S.J. & F. DA1%; MAY, 1999 I NOTE.. I. REMOVE AND RESET METAL BEAM GUARD RAIL AS REQUIRED. NO SEPARATE PAY ITEM, JOSE A. ESTEVE P,I. STk 30+16.51 IV 19298,4410 E ~3560.0834 A = 2'20~5" RE ~_~ 68 LF ~ ~~~H &INSTALL N 19058.4057 ~ 0 r I3587.2146 -~ _~ BY BORING ~ ~ 1-6" BlOW-OFF VALVE 0 ' IREUOVE ~ REPLACE ~ ' I ~ ~ ~ ~ 15 LF 6' OJ.P.W.L + n.5 £Y. ASP~LTPVUr ~.~ ~.~ PInG P.P. i ~ 2_6,x8, BOX * '~: , LF. BY 80RING · P./. 57,4. 28+56.76 _~ RELEASE VALVE CITY OF COPPELL, TEXAS ROAD WATER LINE PLAN-PROFILE STA. 26+00 TO STA. 34.+00 SHIMEX, JACOBS ..t- RNKLEA, LLP. CONSUL'T1NG ENGINEERS Odlae, Teme G.C.H. ~ I~O, EC'T: 96150 ~ ? NO, 26 27 Drawl eY: S, J. & F. OAT(: MAY, 1999 CF I JOSE A. ESTEVE Z VOL 89099, PC. 757 ~ ~ ~o.w. ~ 0 ~L ~ STA~ . ~ z; ~~~ ' ~ . "' ~ I' ' ' ~ ~'J ~ ~ L m~ . . ... . . .. . . ~ , STX ~+22.46 ~CK ~-,r ~ ~-~, ~ i I ' I ' 505 ///~/ .... V+O. ~X ____ - ~ ~ ~9 / 505 ~ / ~ / *~ )~ 500 ____~~ . ~-- __ .......... ~ ~ e ~ 495 . . 'ozz.,~ ~z4'Ec.~". ~, ~ ' " CITY OF COPPELL, TEXAS ~90 I ~/ :~ ~' ~e~r~. _ ' P~-PRORLE i ~/? ... SANDY ~KE ROAD WATER LINE ~ ~ H ~ ~ ~