Loading...
ST9905-CS100701T H E • C 1 T Y O F July 1, 2010 Robert Caudill Tiseo Paving Company PO Box 270040 Dallas TX 75227 RE: Bethel Rd. Project #ST 99 -05 Repairs Needed Under Maintenance Period Dear Mr. Caudill: VIA CERTIFIED MAIL The two -year term on the above referenced maintenance bond began on June 1, 2009, which was the date of final acceptance of the project. A periodic follow -up inspection of the facilities has revealed problems that should be corrected as soon as possible so that further deterioration can be prevented. My site observations revealed that between 20 and 30 linear feet of curb has failed west of Royal Lane. In addition, the expansion joint sealer is coming out of the pavement along the entire project limits. Please contact me at the number below at your earliest convenience to let me know when your crews will be onsite to do the repairs. S' erely, Rick O'Dell�� Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Director of Public Works 255 PARKWAY * P.0.80X 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673