July 1, 2010
Robert Caudill
Tiseo Paving Company
PO Box 270040
Dallas TX 75227
RE: Bethel Rd. Project #ST 99 -05
Repairs Needed Under Maintenance Period
Dear Mr. Caudill:
VIA CERTIFIED MAIL
The two -year term on the above referenced maintenance bond began on June 1, 2009, which was
the date of final acceptance of the project.
A periodic follow -up inspection of the facilities has revealed problems that should be corrected as
soon as possible so that further deterioration can be prevented. My site observations revealed that
between 20 and 30 linear feet of curb has failed west of Royal Lane. In addition, the expansion
joint sealer is coming out of the pavement along the entire project limits.
Please contact me at the number below at your earliest convenience to let me know when your
crews will be onsite to do the repairs.
S' erely,
Rick O'Dell��
Construction Inspector
Office Phone: (972) 304 -7090
Fax: (972) 304 -3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Project Engineer
Glenn Hollowell, P.E., Asst. Director of Public Works
255 PARKWAY * P.0.80X 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673