Loading...
SS9402C-CS 960404P.O. Box 478 CopDelI, Texas 75019 214-462-0022 April 4, 1996 Mr. Doug Bisballe, Vice President Pate Brothers Construction, Inc. 780 West Mansfield Hwy. Kennedale, Texas 76060 RE: Bethel Road Sanitary Sewer Project SS 94-02C Dear Mr. Bisballe: In your letter dated March 29, 1996 you stated that your portion of the Bethel Road Sanitary Sewer Project was basically complete except that you needed to fmish some clean-up items. As you are aware, there is a problem with the connection of the U.S. Postal Center lift station to the new sanitary sewer due to an error in grades shown in the plans. The Engineering Firm that designed the sanitary sewer system, HDR, is currently working on this andwe anticipate having a solution in the very near future. Also, you indicated in your letter there were some unfinished items that needed to be addressed by the City. Below are responses to the unfinished items: "Sewer depth over 15 feet" Please indicate the location, quantity and additional cost for the excess depth. Also, remember that Dallas County had proceeded ahead of the sewer line installation for the majority of this project and removed approximately 12 inches of material. "Barricades furnished to the County for their work to be completed. The County... looking to be reimbursed for the extra delay time on traffic control." Due to the possibility of removing some of the sanitary sewer line already installed in Bethel Road to correct the grade differences to tie in the U.S. Postal Center lift station, Dallas County has not completed the road work. At this time, it is uncertain how long it will be until they are able to complete this work. Please provide a cost for continuing the traffic control devices on a per week basis. Page 2 "The connection to Postal Service building" As mentioned above, this is still being looked at and you will be notified as soon as a solution has been reached. "Re-mobile to complete this connection if needed" Please submit a cost for remobilization once a solution is provided to resolve the grade difference with the connection at the lift station. Sincerely, Michael A. Martin, E.I.T. Assistant City Engineer CONSTRUCTION, INC. March 29, 1996 04-03-96^10:41 RCVD City of Coppell 255 Parkway Coppell, Texas 75019 RE: Bethel~e,t Road Sewer Project ATTN: Mr. Ken Griffin r 4-02-C) Gentlemen: As of this date, our portion of work on the above named project is basically complete. We need to finish some clean-up items. As for the connection to the wet well, I assume it is under discussion and you will let me know of your decision. Also, there are a couple of unfinished items that need to be addressed by the City2 We will need answers on the followin9 items: 1) Sewer depth over 15'. 2) Barricades furnished to the county for their work to be completed. The county said they would be no later than one week behind us to complete their work. We have been 9one from this site for 2 weeks and they have not completed their portion of work. We will be lookin9 to be reimbursed for the extra delay time on the traffic control. 3) The connection to Postal Service building (under discussion at this time). · 4) Re-mobile to complete this connection if needed. Please discuss these items and let me know at your earliest convenience. Sincerely, PA~E BROTHERS CONSTRUCTION, Douglas Bisballe Vice President INC. OFFICE (817) 483-0999 KENNEDALE, TEXAS 76060 FAX (817) 483-0899 ~ ............................. . ........... 780 WEST MANSFIELD HIGHWAY