(7/1/2010) George Marshall - RE: SW08-01 Denton Tap SidewalkPage 1
From:
"Jay Turner" <jayturner@republictitle.com>
To:
"George Marshall" <gmarshall@coppelltx.gov>
Date:
5/4/2010 10:19 AM
Subject:
RE: SW08-01 Denton Tap Sidewalk
No problem...thanks for the info. I'll get the easement signed and the
original to you.
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Tuesday, May 04, 2010 9:53 AM
To: Jay Turner
Subject: RE: SW08-01 Denton Tap Sidewalk
Yes, our contractor will be responsible for any damage. Please note that
we are adjusting the rock wall approximately 1.6' in order to fit the 6'
sidewalk behind the back of curb.
Thank you, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Jay Turner" <jayturner@republictitle.com> 5/4/2010 9:41 AM >>>
Okay, just to be clear, the contractor, in the contract documents with
the city, is responsible for "restoring" the area to original condition.
If there is damage to the sign, or the rock area surrounding it, or the
landscape, the contractor is responsible for restoring, correct?
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Tuesday, May 04, 2010 9:42 AM
To: Jay Turner
Subject: RE: SW08-01 Denton Tap Sidewalk
Mr. Turner,
Please see the attached sheet. This is the design plan sheet in your
area. We have a note to modify the wall around the sign. At this time, I
don't believe we are modifying the sign itself but the contractor will
be responsible for restoring the area to original condition. As far as
the easement goes, we don't need to address the sign specifically.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
(7/1/2010) George Marshall - RE: SW08-01 Denton Tap SidewalkPage 2
>>> "Jay Turner" <jayturner@republictitle.com> 5/4/2010 9:25 AM >>>
Hello George.
Question. As I recall, wasn't there is a need to remove a portion of
the existing rock base of the sign, and some landscape? I think it
might be the State Farm sign. Can you confirm, what improvements, if
any, will be disturbed?
Thanks.
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Tuesday, April 27, 2010 4:42 PM
To: Jay Turner
Subject: RE: SW08-01 Denton Tap Sidewalk
Mr. Turner,
We have revised the last few sentences of the last paragraph to try to
delineate what you are asking for. If you have any further questions,
please feel free to contact me.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Jay Turner" <jayturner@republictitle.com> 3/25/2010 10:18 AM >>>
George,
No problem whatsoever.
Per my previous discussions last year (with the intern that was handling
this, I think), I do not want to have any liability for the maintenance
or repair of the retaining wall, or any other improvements constructed
by the City. That being said, I believe this can be accomplished by
changing the word "GRANTEE" in the last paragraph, to "GRANTOR", where
it states,
"GRANTEE shall not be obligated for future maintenance and upkeep of the
surface area", to read:
"GRANTOR shall not be obligated for future maintenance, repair and/or
upkeep of the surface area or any improvements constructed thereon in
connection with the grant of this Easement."
My reason for this is that at least one time in the past, a car
traveling on Denton Tap has jumped the curb and damaged the property. I
lost a tree at that time. I don't want to be responsible for repairing
or replacing a retaining wall or sidewalk that I didn't pay for in the
first place, in the event a driver is uninsured or that I am otherwise
(7/1/2010) George Marshall - RE: SW08-01 Denton Tap SidewalkPage 3
unable to collect for damages.
I'm granting this easement without any compensation (other than the
nominal statement of $10, so this addition can be the "other valuable
consideration".
Thanks.
Jay
-----Original Message-----
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Thursday, March 25, 2010 9:14 AM
To: Jay Turner
Subject: SW08-01 Denton Tap Sidewalk
Mr. Turner,
I would like to start off be apologizing for not getting back with you
earlier. I am not sure where everyone was at on the sidewalk easement
along Denton Tap. I have attached the necessary documents. You will
notice that there was a change to the original easement due to the need
for a retaining wall along the northwest corner of your property. If you
have any questions or would like to meet and talk about the project
please let me know.
Thank You,
George
George Marshall, PE
City of Coppell
Engineering
972-304-3562