ST0301A-CR100701T H E C 1 T Y O F
COPPELL
F X A S 1 8 9
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01 Phase II -A
OWNER: CITY of COPPELL
CONTRACTOR: JRJ PAVING, LP
WEATHER
TEMP
WIND
HUMIDITY
SUN
CLEAR
OVERCAST
RAIN
SNOW
To 32
32.50
50 -70
70 -85
85 up
Still
Mo
High
Report No
Dry
Mod
Huuti
DAY M T W T F S S
1�
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
NON-
MANUAL
REMARKS
R ' -'s
MANUAL
VISITORS
TIME
REPRESENTATIVE
REPRESENTING
REMARKS
nta �
EQUH'MENT AT THE SITE:
r )1
CONSTRUCTION ACTIVITIES:
SIGNATURE
ENGINEERING DEPT. INSPECTOR