Loading...
ST0301A-CR100630T H E - C I T Y - O F COPPELL PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND MT1mITY SUN CLEAR OVERCA " RAIN SNOW To 32 32 -50 50-70 70 -85 85 u Still Mod High Report No Dry Mod Huttu DAY M W T F S S C) / 2 v AVERAGE FIELD FORCE NAME OF CONTRACTOR NON - MANUAL REMARKS J _'S MANUAL VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS -pq?A Y7 At 11-1 EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: SIGNATURE ENGINEERING DEPT. INSPECTOR