ST9302-SY010102PAVEMENT DISTRESS EVALUATION on "RE- CONSTRUCTED" SANDY LAKE ROAD West -Bound Lanes Moore Road to Denton Tap Road Coppell, Texas ALPHA Report No. 00723 Prepared for: CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Attention: Mr. Ken Griffin, P.E. January 2, 2001 Prepared By: ALPHA TESTING, INC. 2209 Wisconsin Road, Suite 100 Dallas, Texas 75229 A ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 9721620 -8911 - 9721263 -4937 (Metro) FAX 9721406 -8023 January 2, 2001 CITY OF COPPELL 255 Parkway Boulevard Coppell, Texas 75019 Attention: Mr. Ken Griffin, F.E. Re: Pavement Distress Evaluation "RE- CONSTRUCTED" SANDY LAKE ROAD West -Bound Lanes Moore Road to Denton Tap Road Coppell, Texas ALPHA Report No. 00723 Attached is the report of the pavement distress evaluation performed for the project referenced above. This study has been authorized by Mr. Ken Griffin on October 4, 2000 and performed in accordance with ALPHA Proposal No. GT 7655 dated September 29, 2000. This report contains results of field observations, in -place concrete pavement sampling, laboratory testing and an engineering interpretation of these with respect to available project characteristics. The results and analyses have been used to evaluate the most probable cause of pavement distress. Recommendations for limiting future distress and repair of distressed areas (where applicable) will be addressed in a subsequent report pending results of additional field testing (i.e., impact echo survey) to be performed at a later date. ALPHA TESTING, INC. appreciates the opportunity to be of service on this project. If we can be of further assistance, such as performing the recommended impact echo survey, please contact our office. Sincerely yours, ALPHA TESTING, INC. Pi( A. Lewis, P_. E. leer of Engineering Services 3iIEL. Hillhouse, P.E. President DAL /JLH /hva Copies: (3) Client Geoteci !niccrl F_ngineerinq ,v Construction Materials Testing n Environmental Engineering ff Consufhng TABLE OF CONTENTS 111 - fl "RE- CONSTRUCTED" SANDY LAKE ROAD West -Bound Lanes Moore Road to Denton Tap Road Coppell, Texas ALPHA Report No. 00723 1 .0 PURPOSE AND SCOPE ..................................................................... ............................... l 2.0 PROJECT CHARACTERISTICS ........................................................ ..............................2 3.0 CONCRETE SAMPLING ..................................................................... ..............................2 4.0 CONCRETE DISTRESS SURVEY ..................................................... ............................... 5.0 OBSERVATION OF CONCRETE PLACEMENT ............................. ............................... ti 6.0 CONCLUSIONS AND OPINIONS ................................. ............................... APPENDICES APPENDIX A Photographs of Concrete Cores — Pages 1 -5 APPENDIX B Photographs of 50 -ft. Section Survey beginning at Station No. 26 +80 — Pages 1 -10 Photographs of 50 -ft. Section Survey beginning at Station No. 48 +70 — Pages 11 -20 APPENDIX C Photographs of Aggregate Stockpiles, Concrete Placement and Finishing Methods — Pages 1 -5 ALPHA Report No. 00723 1.0 PURPOSE AND SCOPE The initial purpose of this pavement distress evaluation is to evaluate some of the physical and engineering properties of the in -place concrete at the subject site with respect to evaluation of the most probable cause of pavement distress, methods of limiting future distress and repair of the distressed pavement. However, in view of results of this study concerning the most probable cause of pavement distress, recommendations for limiting future distress and repair of distressed pavement will be provided pending results of subsequent impact echo surveys discussed later in this report. In addition, two 50 -ft sections of the existing concrete pavement were surveyed to document the location, size, frequency and depth of existing voids in the surface of the existing concrete pavement. Finally, the investigation also included field observations of a typical concrete placement for the east -bound lanes (currently under construction) to evaluate concrete production, placement, finishing methods and procedures during a single day to aid in identifying if the current pavement distress in the west -bound lanes can be related to methods or materials used in concrete placement. Engineering analyses have been performed from results of the concrete core samples and field observations. The analyses have been used to develop engineering conclusions and recommendations regarding the cause of observed distress for the pavement in the study area. Sampling of the in -place concrete has been accomplished by coring the concrete pavement. Cores were spaced at five different locations (3 cores per location) along the west -bound lane of "re- constructed" Sandy Lake Road between Moore Road and Denton Tap Road in Coppell, Texas. At the time this study was performed, construction was in progress for the east -bound lanes of the subject `re- constructed" roadway. Professional services provided in this distress evaluation have been performed, findings obtained, and recommendations prepared in accordance with generally accepted engineering principles and practices. ALPHA TESTING, INC. is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for exclusive use of the Client (and their design representatives) and remedial design of the specific pavement outlined in Section 2.0. Recommendations presented in this report should not be used for design of any other pavement except that specifically described in this report. Opinions and conclusions provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the conclusions. 2.0 PROJECT CHARACTERISTICS The existing west -bound lanes of "re- constructed" Sandy Lake Road were constructed in about December, 1999 between Denton Tap Road and Moore Road in Coppell, Texas. This portion of Sandy Lake Road has experienced distress in the form of numerous relatively small, shallow "voids" in the top surface of the pavement measuring about 1 to 8 inches in diameter. The 1 ALPHA Report No. 00723 distress is generally observable as sporadic and the voids are spread randomly although there appears to be a slight increase in frequency of voids along vehicle wheel path lines. The depth of the voids varies between less than about 0.25 inches to almost 6 inches. According to the City of Coppell, the number of "voids" observed in the surface of the subject concrete pavement has increased over time. 3.0 CONCRETE SAMPLING Samples of the in -place concrete pavement were obtained at five different locations varying from non - distressed to distressed areas. Core Location No. 2 (at Station No. 47 +24) was performed in a non - distressed area while the remainder of the cores were performed in areas with slight distress to heavy distress. Three (3) cores samples (each measuring about 4 inches in diameter) were obtained at each selected test location. At each sample location in distressed areas, two cores were performed within the void area while the third core was performed just outside the void.. The core holes were immediately patched using high strength grout material. The approximate location of each concrete core location and the general outline of the cores at each location are shown in the following photographs: PA 2. At Station No. 47 +24 1. At Station No. 49+00 near Moore Road ALPHA Report No. 00723 Based on results from the existing in -place concrete cores, the depth of the concrete varies from about 8 inches to about 9 inches while the depth of the voids varies from about 2 inches to almost 5 inches in the core samples obtained. The width of the surface voids at the cored locations varies from about 1.5 to at least 4 inches. Photographs of each core obtained are enclosed in Appendix A at the end of this report. 4.0 CONCRETE DISTRESS SURVEY A concrete distress survey was performed at two different locations along the existing west -bound lanes of the `re- constructed" Sandy Lake Road. As part of the survey, two 50 -ft sections of the west -bound lanes (beginning at Station No. 26 +80 and 48 +70) were surveyed by taking photographic pictures to document the location, size and frequency of the existing surface voids. The survey at each location included a section of pavement 50 ft long and 27 ft wide. 3 4. At Station No. 26 +36 3. At Station No. 34 +32 5. At Station No. 5 +50 near Denton Tap Road ALPHA Report No. 00723 Each 50 -ft by 27 -ft section was divided into 60 panels, each measuring about 5 ft by 4.5ft. Photographs of each 50 -ft section are enclosed in Appendix B. The general layout and the numbering of the photographs for each 50 -ft section is outlined below: 51 50 31 30 11 10 52 49 32 29 12 9 53 48 33 28 13 8 54 47 34 27 14 7 55 46 35 26 15 6 56 45 36 25 16 5 57 44 37 24 17 4 58 43 38 23 18 3 59 42 39 22 19 2 60 1 41 40 21 20 1 4 ALPHA Report No. 00723 5.0 OBSERVATION OF CONCRETE PLACEMENT Field observations of concrete placement were performed on November 30, 2000 for east -bound lanes currently under construction and located generally west of Mockingbird Lane. Observations of concrete placement were made by a Professional Engineer to aid in identifying if the current pavement distress in the "re- constructed" west -bound lanes can be related to methods and materials used in on -going concrete placement. Photographs taken during the field observations are enclosed in Appendix C. 6.0 CONCLUSIONS AND OPINIONS According to visual observations performed along the "re- constructed" portion of the west -bound lanes for Sandy Lake Road between Moore Road and Denton Tap Road, surface voids were noted sporadically and /or randomly along the subject pavement. Results of examination of concrete cores performed in the subject pavement indicate the primary cause for the voids in the concrete pavement is the presence of clayballs in the concrete mix at the time of concrete placement. As noted in the photographs in Appendix A, the voids (filled with clayballs and debris) extend down into the concrete core samples and then sometimes outward even beyond the cored sample. It is our opinion clayballs were present in the aggregate stockpiles at the on -site batch plant and then incorporated into the concrete mix for the subject pavement. Observations performed during concrete placement for the eastbound lanes west of Mockingbird Lane indicated clayballs were present in the aggregate stockpiles as shown in the photographs enclosed in Appendix C. In addition, the exposed ground surface near the aggregate stockpiles consist of natural clayey type soils. Therefore, it is possible equipment used to handle the aggregate might have also co- mingled portions of the aggregate with the on -site soils before placement in the on -site concrete mixing hopper. Also, it is possible the concrete aggregate was hauled to the site containing clayballs. A third and somewhat less likely possibility of incorporating clayballs into the concrete pavement was the finishing procedures used in the concrete placement, such as scooping up excess concrete from outside the slip forms and placing the excess concrete back into the concrete pavement. Photographs illustrating the above mentioned situations are enclosed in Appendix C. Visual observations of some concrete test cylinders from ALPHA Project No. 98881 (SANDY LAKE ROAD) indicated a sparkling or shiny material present in the fractured surfaces of some of the coarse aggregate particles. Results of a limited petrographic analysis performed on fragments of concrete cylinder No. 157 (ALPHA Project No. 98881, Sandy Lake Road in Coppell) indicate the limestone particles contained calcite crystals with large rhombohedral cleavage planes, giving the sparkle or shiny appearance. These cleavage planes, when viewed microscopically under reflective light, are often seen as tiny sparkles of light. These large cleavage fragments observed in the test cylinders are somewhat the exception rather than the rule, but do not compromise the general quality of the limestone, and should not affect future performance of the concrete. 5 ALPHA Report No. 00723 Concrete distress surveys performed at two different locations indicate the voids are sporadic and/or randomly located. Results of the survey of two 50 -ft sections indicated the presence of voids was slightly more pronounced in wheel path lanes. The width of the voids in the surveyed area varies from less than about an inch to about 8 inches while the depth of the voids varies from about 0.25 to 6 inches. Photographs provided in Appendix B of this report indicate the location, size and frequency of the potholes at the time of the survey. Review of the density tests and concrete compressive strength tests (ALPHA Job No. 98881) indicated the compaction of the paving subgrade and the concrete strength for the pavement conformed to project specifications. However, the existing voids reduce the thickness of concrete pavement. Hence, these voids would limit the future load carrying capacity (and useful life) of the concrete pavement. Further, it is likely rain water and other surface water sources would increase the rate of deterioration of the concrete pavement from freeze -thaw action. The extent and type of repairs recommended is dependent upon the extent and frequency of voids in the existing pavement. Since it is our understanding the number of voids observed continues to increase with time, adequate information is not currently available to support recommendations for the method of repair. Hence, it is recommended an impact echo survey be performed on the existing pavement to further evaluate the extent of distress (voids). This method allows for evaluation of the presence of voids that might not yet be visible at the surface of the concrete pavement. In areas where voids are numerous and extensive, complete removal of selected concrete panels may be required. In other areas where voids are relatively minor, cleaning and filling the voids with high strength grout might be an option. These and other remedial repair methods would be explored more fully pending results of the impact echo survey. P1 APPENDIX "A" Photographs of Concrete Cores ®����a, L- :y . Pit . M, ALPHA Report No. 00723 CONCRETE CORE PHOTOGRAPHS APPENDIX "B" Photographs of 50 -ft. Section Survey (Beginning at Station No. 26 +80 & 48 +70 GENERAL LAYOUT OF THE 50 -FT SECTION PHOTOGRAPHIC SURVEY BEGINNING AT STATION NO. 26 +80 26 +80 26 +90 27 +00 27 +10 27 +20 27 +30 51 50 31 30 11 10 52 49 32 29 12 9 53 48 33 28 13 8 54 47 34 27 14 7 55 46 35 26 15 6 56 45 36 25 16 5 57 44 37 24 17 4 58 43 38 23 18 3 59 42 39 22 19 2 60 41 40 21 20 1 27 ft. 50 ft. F'o I -3 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 ALPHA Report No. 00723 50-FT. SECTION SURVEY beginning at STATION NO. 26+80 L 17 MVE ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 I ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 ;r E P � �A i I: G., f- rA ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 M 8 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 0 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 26 +80 10 _ _ 1 GENERAL LAYOUT OF THE 50 -FT SECTION PHOTOGRAPHIC SURVEY BEGINNING AT STATION NO. 48 +70 48 +70 48 +80 48 +90 49 +00 49 +10 49 +20 51 50 31 30 11 10 52 49 32 29 12 9 53 48 33 28 13 8 54 47 34 27 14 7 55 46 35 26 15 6 56 45 36 25 16 5 57 44 37 24 17 4 58 43 38 23 18 3 59 42 39 22 19 2 60 41 40 21 20 1 27 ft. 50 ft. ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 12 13 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 14 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 15 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 16 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 17 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 18 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 19 ALPHA Report No. 00723 50 -FT. SECTION SURVEY beginning at STATION NO. 48 +70 20 APPENDIX "C" Photographs of Aggregate Stockpiles, Concrete Placement and Finishing Methods ALPHA Report No. 00723 Vicinity of Stockpiles and Batch Plant Areas ALPHA Report No. 00723 -_ 7� r - t � s . Vicinity of Stockpile and Batch Plant Areas 2 Aggregate Stockpile Showing Clayballs ALPHA Report No. 00723 AW t "'L _f 00 j. 44 4V r � � � �-:�� � � ► ,; =f cat - {� ti k µ 4{ 4 - I - �-- 3 Aggregate Stockpile Showing Clayballs ALPHA Report No. 00723 ( s D+ N t V Aggregate Stockpile Showing Clayballs 4 ALPHA Report No. 00723 A-1 Finishing Procedures used in Concrete Placement