ST0301A-LR100630RuUAncE
G cEorEcnrocAL
Cffi UP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
Acct ID:
1770 File No: C10 -0631
Date Sampled: 06/25/2010
Report Date: 06/30/2010
Sampled By: William Shelton
Project:
Bethel Road Paving & Utility Improvements
By Order Of: Larry Davis
Location:
Field Density Cancellation
Order Number: Vendor #9176
Contractor:
JRJ Paving
Client:
The City of Coppell
REPORT:
Daily Field Activity
LAB NO: 87063
TEST RESULTS Report No: 87063
Page 1 of 1
As requested, a representative of Alliance Geotechnical Group to the above project site for in -place density testing.
Upon arrival, AGG was informed that they were not ready for testing and re- scheduled for Monday 06/29/10.
AGG spoke with Larry Davis, a representative for the City of Coppell about specification information, Mr. Davis informed
AGG that they will be using COG for specification reference.
Charge: The City of Coppell Attn: Keith Marvin, P.E.
Orig: The City of Coppell (Coppell, TX) Attn: Keith Marvin, P.E. (1 -ec copy)
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Marty Murphy
1 -ec The City of Coppell Attn: Larry Davis
Respectfully Submitted,
Alliance Geotechnical Group
Y 4 . 9--
Robert P. Nance, Sr. Project Manager