Loading...
ST0301A-LR100630RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 06/25/2010 Report Date: 06/30/2010 Sampled By: William Shelton Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Field Density Cancellation Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Daily Field Activity LAB NO: 87063 TEST RESULTS Report No: 87063 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group to the above project site for in -place density testing. Upon arrival, AGG was informed that they were not ready for testing and re- scheduled for Monday 06/29/10. AGG spoke with Larry Davis, a representative for the City of Coppell about specification information, Mr. Davis informed AGG that they will be using COG for specification reference. Charge: The City of Coppell Attn: Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Marty Murphy 1 -ec The City of Coppell Attn: Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager