ST0301A-LR100708 • -___ .. Consulting Engineering * Geotechnical Engineering * Construction Materials
fLLIFIIICE 3228 Halifax Street, Suite A, Dallas, Texas 75247
I
GE IT H ICFIL Phone: (972) 444 -8889 Fax: (972) 444 -8893
GROUr
Acct ID: 1299 File No: C10 -0631 Date Sampled: 07/02/2010
Report Date: 07/08/2010 Sampled By: David Mitchell
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Concrete Cancellation Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Concrete Cancellation LAB NO: 87191
TEST RESULTS Report No: 87191
Page 1 of 1
As requested, a representative of Alliance Geotechnical Group went to the project site for concrete testing and
inspection. Upon arrival, AGG was informed that they were not going to pour concrete on the inlet due to rain. AGG
informed the City of Coppell about the cancellation.
Orig. The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P E. Respectfully Submitted,
(1 -ec copy)
1 -ec The City of Coppell Attn: Mr. Keith Marvin, P E. Alliance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy .",--- , s$
1 -ec The City of Coppell Attn: Mr. Larry Davis f /
r_
Robert P. Nance, Sr. Project Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY
IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE
ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.