Loading...
ST0301A-LR100708 • -___ .. Consulting Engineering * Geotechnical Engineering * Construction Materials fLLIFIIICE 3228 Halifax Street, Suite A, Dallas, Texas 75247 I GE IT H ICFIL Phone: (972) 444 -8889 Fax: (972) 444 -8893 GROUr Acct ID: 1299 File No: C10 -0631 Date Sampled: 07/02/2010 Report Date: 07/08/2010 Sampled By: David Mitchell Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Concrete Cancellation Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Concrete Cancellation LAB NO: 87191 TEST RESULTS Report No: 87191 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group went to the project site for concrete testing and inspection. Upon arrival, AGG was informed that they were not going to pour concrete on the inlet due to rain. AGG informed the City of Coppell about the cancellation. Orig. The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P E. Respectfully Submitted, (1 -ec copy) 1 -ec The City of Coppell Attn: Mr. Keith Marvin, P E. Alliance Geotechnical Group 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy .",--- , s$ 1 -ec The City of Coppell Attn: Mr. Larry Davis f / r_ Robert P. Nance, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.