G GEOTECHI'IfCRL
GRC?UP
Acct ID: 1770
Report Date: 07/09/2010
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
File No: C10 -0631
Project: Bethel Road Paving & Utility Improvements
Location: Bethel Road Pier Verification
Date Sampled: 07/01/2010
Sampled By: Aaron Allen
By Order Of: Larry Davis
Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Geotechnical Engineer Pier Verification LAB NO: 87337
TEST RESULTS Report No: 87337
Page 1 of 1
As requested, a representative of Alliance Geotechnical Group went to the above project site for drilled pier operations.
Due to the inability to use an 18" diameter auger on the drilling rig kelly bar, Pier #18 was drilled as a 20" diameter pier.
Gravel from a sanitary sewer was observed at a depth of approximately 11 feet at pier #18. Consequently 24" diameter
casing was required. In addition, casing was required due to the presence of groundwater near the interface of the
gravel and shale at pier #18. Casing was also used at pier #11.
Charge: The City of Coppell Attn: Mr. Keith Marvin P.E. Respectfully Submitted,
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1- eccopy) Alliance Geotechnical Group
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Mr. Larry Davis
Robert P. Nance, Sr. Project Manager
ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893
DRILLED PIER INSPECTION REPORT
CLIENT: The City of Coppell REPORT DISTRIBUTION:
PROJECT: Bethel Road Paving & Utility City of Coppell - Keith Marvin, P.E.
AGG REPORT #: C10 0631 - 87212 - City of Coppell - Larry Davis
REPORT DATE: 07/09/10 Freese & Nichols - B. Caleb Thornill, P.E.
INSPECTOR/DATE: John Schuler 07/06/10 JRJ Paving - Marty Murphy
DRILLING COMPANY: ATS
Pier Location (grid lines) WW4 -R1
Design Shaft Diameter (inches) 18.0 inches
Design Penetration (feet) 5.0 feet
Elevation of Top of Pier (feet) 469.0 feet
Ground Elevation (feet) 498.9 feet
Actual Shaft Diameter (inches) 20.0 inches
Depth to Bearing Stratum - Hard unweathered
gray Shale (feet) 21.0 feet
Required Pier Depth (feet) 26.0 feet
Actual Pier Depth (feet) 31.0 feet
Actual Pier Penetration (feet) 10.0 feet
Elevation of Top of Bearing Stratum 477.9 feet
Elevation of Bottom of Pier 467.9 feet
Pier Location within Tolerance yes
Pier Plumb within Specifications yes " .
Casing Required yes
Depth to Bottom of Casing (feet) 18.0 feet
Depth to Top of Casing ( " -" (minus) if above
ground) 5.0 feet
Depth to Bottom of Casing 23.0 feet
Depth required Due to Casing 28.0 feet
Water Present in Hole at Concrete Pour no
Pier Bottom Clean yes
Vertical Bars (number & Size) 6 - #6
Horizontal Ties (Size & Spacing) 3 @ 12"
Steel Cage Diameter 12.0 inches
Length of Steel Cage 23.5 feet
Concrete Placed in Center of Pier Hole with a
Hopper or Inverted Chute yes
REMARKS:
ALLIANCE GEOTECHNICAL GROUP 1
ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone:972 -444 -8889 Fax: 972 - 444 -8893
DRILLED PIER INSPECTION REPORT
CLIENT: City of Coppell REPORT DISTRIBUTION:
PROJECT: Bethel Road II City of Coppell - Keith Marvin, P.E.
AGG REPORT #: C10- 0631 - 87260 -1 City of Coppell - Larry Davis
REPORT DATE: 7/9/2010 Freese & Nichols - B. Caleb Thornill, P.E.
INSPECTOR /DATE: 7/7/2010 JRJ Paving - Marty Murphy
AGG Pier No.
Pier Location (grid lines) DS 3 -1
Design Shaft Diameter (inches) 30.0 inches
Design Penetration (feet) 8.0 feet
Design Elevation of Bottom of Pier (feet) 466.0 feet
Ground Elevation (feet) 481.77 feet
Actual Shaft Diameter (inches) 30.0 inches
Depth to Bearing Stratum - Unweathered hard
Gray Limestone (feet) 1.00 feet
Required Pier Depth (using des. pen.) (J +A) 9.00 feet
Required Pier Depth (using des. pen.) (I +H) 15.77 feet
Actual Pier Depth (= or > B, Z and D) 16.70 feet
Actual Pier Penetration 15.70 feet
Pier Location within Tolerance yes
Pier Plumb within Specifications yes
Casing Required no
Length of Casing na
Depth to Top of Casing (" - " (minus) if above
ground) na
Depth to Bottom of Casing (E + F) na
Depth Required Due to Casing (G + A) na
Water Present in Hole at Concrete Pour no
Pier Bottom Clean yes
Vertical Bars (number & Size) 8 - #9's
Horizontal Ties (Size & Spacing) #3 spiral
•
Steel Cage Diameter 24.0 inches
Length of Steel Cage 9.0 feet
Concrete Placed in Center of Pier Hole with a
Hopper or Inverted Chute yes
REMARKS:
ALLIANCE GEOTECHNICAL GROUP
R�UAncE
G GI'IfCRL
GRC?UP EOTECH
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
Acct ID:
1299 File No: C10 -0631
Date Sampled: 06/30/2010
Report Date: 07/09/2010
Sampled By: John Carson
Project:
Bethel Road Paving & Utility Improvements
By Order Of: Larry Davis
Location:
Order Number: Vendor #9176
Contractor:
JRJ Paving
Client:
The City of Coppell
REPORT:
Cylinder Pick -Up
LAB NO: 87488
TEST RESULTS Report No: 87488
Page 1 of 1
Remarks: On this date a representative of AGG reported to the project site to pick -up cylinders.
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy)
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Marty Murphy
1 -ec The City of Coppell Attn: Mr. Larry Davis
Respectfully Submitted,
Alliance Geotechnical Group
Robert P. Nance, Sr. Project Manager