Loading...
ST0301A-LR100709êëöçôåô øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ  ø÷ ø÷  åøëõøçõ R�UAncE G GEOTECHI'IfCRL GRC?UP Acct ID: 1770 Report Date: 07/09/2010 Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -0631 Project: Bethel Road Paving & Utility Improvements Location: Bethel Road Pier Verification Date Sampled: 07/01/2010 Sampled By: Aaron Allen By Order Of: Larry Davis Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Geotechnical Engineer Pier Verification LAB NO: 87337 TEST RESULTS Report No: 87337 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group went to the above project site for drilled pier operations. Due to the inability to use an 18" diameter auger on the drilling rig kelly bar, Pier #18 was drilled as a 20" diameter pier. Gravel from a sanitary sewer was observed at a depth of approximately 11 feet at pier #18. Consequently 24" diameter casing was required. In addition, casing was required due to the presence of groundwater near the interface of the gravel and shale at pier #18. Casing was also used at pier #11. Charge: The City of Coppell Attn: Mr. Keith Marvin P.E. Respectfully Submitted, Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1- eccopy) Alliance Geotechnical Group 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: The City of Coppell REPORT DISTRIBUTION: PROJECT: Bethel Road Paving & Utility City of Coppell - Keith Marvin, P.E. AGG REPORT #: C10 0631 - 87212 - City of Coppell - Larry Davis REPORT DATE: 07/09/10 Freese & Nichols - B. Caleb Thornill, P.E. INSPECTOR/DATE: John Schuler 07/06/10 JRJ Paving - Marty Murphy DRILLING COMPANY: ATS Pier Location (grid lines) WW4 -R1 Design Shaft Diameter (inches) 18.0 inches Design Penetration (feet) 5.0 feet Elevation of Top of Pier (feet) 469.0 feet Ground Elevation (feet) 498.9 feet Actual Shaft Diameter (inches) 20.0 inches Depth to Bearing Stratum - Hard unweathered gray Shale (feet) 21.0 feet Required Pier Depth (feet) 26.0 feet Actual Pier Depth (feet) 31.0 feet Actual Pier Penetration (feet) 10.0 feet Elevation of Top of Bearing Stratum 477.9 feet Elevation of Bottom of Pier 467.9 feet Pier Location within Tolerance yes Pier Plumb within Specifications yes " . Casing Required yes Depth to Bottom of Casing (feet) 18.0 feet Depth to Top of Casing ( " -" (minus) if above ground) 5.0 feet Depth to Bottom of Casing 23.0 feet Depth required Due to Casing 28.0 feet Water Present in Hole at Concrete Pour no Pier Bottom Clean yes Vertical Bars (number & Size) 6 - #6 Horizontal Ties (Size & Spacing) 3 @ 12" Steel Cage Diameter 12.0 inches Length of Steel Cage 23.5 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes REMARKS: ALLIANCE GEOTECHNICAL GROUP 1 ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone:972 -444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: City of Coppell REPORT DISTRIBUTION: PROJECT: Bethel Road II City of Coppell - Keith Marvin, P.E. AGG REPORT #: C10- 0631 - 87260 -1 City of Coppell - Larry Davis REPORT DATE: 7/9/2010 Freese & Nichols - B. Caleb Thornill, P.E. INSPECTOR /DATE: 7/7/2010 JRJ Paving - Marty Murphy AGG Pier No. Pier Location (grid lines) DS 3 -1 Design Shaft Diameter (inches) 30.0 inches Design Penetration (feet) 8.0 feet Design Elevation of Bottom of Pier (feet) 466.0 feet Ground Elevation (feet) 481.77 feet Actual Shaft Diameter (inches) 30.0 inches Depth to Bearing Stratum - Unweathered hard Gray Limestone (feet) 1.00 feet Required Pier Depth (using des. pen.) (J +A) 9.00 feet Required Pier Depth (using des. pen.) (I +H) 15.77 feet Actual Pier Depth (= or > B, Z and D) 16.70 feet Actual Pier Penetration 15.70 feet Pier Location within Tolerance yes Pier Plumb within Specifications yes Casing Required no Length of Casing na Depth to Top of Casing (" - " (minus) if above ground) na Depth to Bottom of Casing (E + F) na Depth Required Due to Casing (G + A) na Water Present in Hole at Concrete Pour no Pier Bottom Clean yes Vertical Bars (number & Size) 8 - #9's Horizontal Ties (Size & Spacing) #3 spiral • Steel Cage Diameter 24.0 inches Length of Steel Cage 9.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes REMARKS: ALLIANCE GEOTECHNICAL GROUP R�UAncE G GI'IfCRL GRC?UP EOTECH Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1299 File No: C10 -0631 Date Sampled: 06/30/2010 Report Date: 07/09/2010 Sampled By: John Carson Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Cylinder Pick -Up LAB NO: 87488 TEST RESULTS Report No: 87488 Page 1 of 1 Remarks: On this date a representative of AGG reported to the project site to pick -up cylinders. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager