Loading...
ST0301A-CR100706T H E - C 1 T Y - O F COPPELL r a PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY SUN CLEAR OVERCAST RAIN SNOW To 32 32 -50 50.70 70 -85 85 up Still Mod High Report No Dri Mod Humid DAY M T W T F S S AVERAGE FIELD FORCE NAME OF CONTRACTOR 12 > NON- MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: An t CC T ✓ Q yl SIGNATURE ENGINEERING DEPT. INSPECTOR