ST0301A-LR100714R�UAncE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/08/2010 Report Date: 07/14/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Drilled Bridge Pier Observation Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Drilled Bridge Pier Observation LAB NO: 87379 TEST RESULTS Report No: 87379 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group went to the project site to observe drilled pier operations. Only one pier was worked on but not completed. DS3 -3 pier was initially drilled and poured in the wrong location. Redrilling with an oversized auger was done through the concrete and into the bearing stratum. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/07/2010 Report Date: 07/14/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Piers Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Soils Attachment LAB NO: 87260 -1 Test Method: See Below TEST RESULTS Report No: 87260 -1 Page 1 of 1 Remarks: See attached report. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone:972- 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: City of Coppell REPORT DISTRIBUTION: PROJECT: Bethel Road II City of Coppell - Keith Marvin, P.E. AGG REPORT #: C10- 0631 - 87260 -1 City of Coppell - Larry Davis REPORT DATE: 7/9/2010 Freese & Nichols - B. Caleb Thornill, P.E. INSPECTOR /DATE: 7/7/2010 JRJ Paving - Marty Murphy DRILLING COMPANY: ATS AGG Pier No. 7 6 10 9 5 Pier Location (grid lines) DS 2 -3 DS 2 -2 DS 3 -3 DS 3 -2 DS 2 -1 Design Shaft Diameter (inches) 30.0 inches 30.0 inches 30.0 inches 30.0 inches 30.0 inches Design Penetration (feet) 8.0 feet 8.0 feet 8.0 feet 8.0 feet 8.0 feet Design Elevation of Bottom of Pier (feet) 466.0 feet 466.0 feet 466.0 feet 466.0 feet 466.0 feet Ground Elevation (feet) 480.15 feet 481.93 feet 483.30 feet 482.15 feet 479.19 feet Actual Shaft Diameter (inches) 30.0 inches 30.0 inches 30.0 inches 30.0 inches 30.0 inches Depth to Bearing Stratum - Unweathered hard Gray Limestone (feet) 3.60 feet 6.00 feet 5.75 feet 4.75 feet 5.00 feet Required Pier Depth (using des. pen.) (J +A) 11.60 feet 14.00 feet 13.75 feet 12.75 feet 13.00 feet Required Pier Depth (using des. pen.) (I +H) 14.15 feet 15.93 feet 17.30 feet 16.15 feet 13.19 feet Actual Pier Depth (= or > B, Z and D) 14.20 feet 16.10 feet 17.70 feet 16.20 feet 13.20 feet Actual Pier Penetration 10.60 feet 10.10 feet 11.95 feet 11.45 feet 8.20 feet Pier Location within Tolerance yes yes yes yes yes Pier Plumb within Specifications yes yes yes yes yes Casing Required no no no no no Length of Casing n.a. n.a. n.a. n.a. n.a. Depth to Top of Casing (" - " (minus) if above ground) na na na na na Depth to Bottom of Casing (E + F) na na na na na Depth Required Due to Casing (G + A) na na na na na Water Present in Hole at Concrete Pour no no no no no Pier Bottom Clean yes yes yes yes yes Vertical Bars (number & Size) 849's 849's 849's 849's 849's Horizontal Ties (Size & Spacing) #3 spiral #3 spiral #3 spiral #3 spiral error Steel Cage Diameter 24.0 inches 24.0 inches 24.0 inches 24.0 inches 24.0 inches Length of Steel Cage 9.0 feet 9.0 feet 9.0 feet 9.0 feet 9.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes yes yes yes yes KtMAKK ALLIANCE GEOTECHNICAL GROUP ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone:972- 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: City of Coppell PROJECT: Bethel Road II AGG REPORT #: C10- 0631 - 87260 -1 REPORT DATE: 7/9/2010 INSPECTOR /DATE: 7/7/2010 REPORT DISTRIBUTION: City of Coppell - Keith Marvin, P.E. City of Coppell - Larry Davis Freese & Nichols - B. Caleb Thornill, P.E. JR.] Pavinn - Marty Murnhv AGG Pier No. Pier Location (grid lines) DS 3 -1 Design Shaft Diameter (inches) 30.0 inches Design Penetration (feet) 8.0 feet Design Elevation of Bottom of Pier (feet) 466.0 feet Ground Elevation (feet) 481.77 feet Actual Shaft Diameter (inches) 30.0 inches Depth to Bearing Stratum - Unweathered hard Gray Limestone (feet) 1.00 feet Required Pier Depth (using des. pen.) (J +A) 9.00 feet Required Pier Depth (using des. pen.) (I +H) 15.77 feet Actual Pier Depth (= or > B, Z and D) 16.70 feet Actual Pier Penetration 15.70 feet Pier Location within Tolerance yes Pier Plumb within Specifications yes Casing Required no Length of Casing na Depth to Top of Casing (" - " (minus) if above ground) na Depth to Bottom of Casing (E + F) na Depth Required Due to Casing (G + A) na Water Present in Hole at Concrete Pour no Pier Bottom Clean yes Vertical Bars (number & Size) 849's Horizontal Ties (Size & Spacing) #3 spiral Steel Cage Diameter 24.0 inches Length of Steel Cage 9.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes KtMAKKJ: ALLIANCE GEOTECHNICAL GROUP R1-UAncE GEOTECHnPCRL 'GROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/06/2010 Report Date: 07/14/2010 Sampled By: Schuler, Jon Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: 10' Recess Curb Inlet Walls & Bottom on Storm Drain Line "D ", Order Number: Vendor #9176 Air Content: 2.8% Station 3 +03.65 Time Sampled: 1:30 pm Contractor: JRJ Paving Number of 92 °F Mix: 94 °F Client: The City of Coppell Specimens: 4 REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 87234 Material: CONCRETE Test Method: See Below TEST RESULTS Report No: 87234 Page 1 of 1 Spec Age Tested Nbr (days) A 7 B 28 C 28 D Transported By: Southern Star Diameter Area (in) (in') 6.00 28.27 6.00 28.27 6.00 28.27 Maximum Load (lbs) Break Type 103,570 Type 3 millmiul���� Average Strength (PSI) Comments 3,660 HOLD (see remarks) - Compressive Cure Strength Loc (PSI) Lab 3,660 Lab 07/07/2010 Lab Transported By: Southern Star millmiul���� Average Strength (PSI) Comments 3,660 HOLD (see remarks) - Quantity Represented: 5 cu. yds. at 10 cu. yds. placed of a 10 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ATM C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group r - Robert P. Nance, Sr. Project Manager Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Specification: 4,000 psi @ 28 days Date Received: 07/07/2010 Slump: 2.5 Inches Transported By: Southern Star Curing Method: Standard Air Content: 2.8% Source /Sampled At: Truck / Center Time Sampled: 1:30 pm Plant: #111 Temp.: Ambient: 92 °F Mix: 94 °F Mix Code: 9363 Truck/Ticket No: 6235 / 1685133 Quantity Represented: 5 cu. yds. at 10 cu. yds. placed of a 10 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ATM C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group r - Robert P. Nance, Sr. Project Manager RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/07/2010 Report Date: 07/14/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Piers Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Soils Attachment LAB NO: 87260 -1 Test Method: See Below TEST RESULTS Report No: 87260 -1 Page 1 of 1 Remarks: See attached report. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager MOISTURE DENSITY RELATIONSHIP REPORT 123 ! i . i • 1 I 1 i 1 I 118 I I I i ■ I 113 I , I , � I i -- — T C i e _ 108 • i 1'! j ri.—: I , ... Sp.G. _ _ i I _ 2.65 103 1 i - -- - - - ■ 6.5 9.0 11.5 14.0 16.5 19.0 21.5 Water content, i Test specification: ASTM D 698 -00 Procedure A Standard i Elev/ Classification Nat. % > % < Sp.G. LL PI Depth USCS AASHTO Moist. No,4 No.200 30 15 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 114.9 pcf ORANGE1SH YELLOW & LIGIIT BROWN CLAYEY SAND Optimum moisture = 13.3 % Project No. C10 -0631 Client: The City of Coppell Remarks: Project: Bethel Road II C10 -0631 - 87809 •' > AGG 4/ • Location: STOCKPILE (SAMPLED 07-14-2010) - MOISTURE DENSITY RELATIONSHIP REPORT ALLIANCE GEOTECHNICAL GROUP Figure 8052 R�UAncE G GI'IfCRL GRC?UP EOTECH Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1299 File No: C10 -0631 Date Sampled: 07/07/2010 Report Date: 07/14/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Cylinder Pick -Up LAB NO: 87260 -2 TEST RESULTS Report No: 87260 -2 Page 1 of 1 Remarks: On this date a representative of AGG reported to the project site to pick -up cylinders. Charge: JRJ Paving Attn: Mr. Marty Murphy Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager