Loading...
ST0301A-LR100715 ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 3228 Halifax Street, Dallas, Texas 75247 Phone: 972 - 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: The City of Coppell REPORT DISTRIBUTION: PROJECT: Bethel Road Paving & Utility City of Coppell - Keith Marvin, P.E. AGG REPORT #: 010- 0631 - 87435 -1 City of Coppell - Larry Davis REPORT DATE: 7/15/10 Freese & Nichols - B. Caleb Thornill, P.E. INSPECTOR /DATE: 7/9/10 JRJ Paving - Marty Murphy DRILLING COMPANY: Jerry's Pier Drilling AGG Pier No. 10 13 Pier Location (grid lines) DS3 -3 DS4 -3 Design Shaft Diameter (inches) 30.0 inches 30.0 inches Design Penetration (feet) 8.0 feet 5.0 feet Design Elevation of Bottom of Pier (feet) 466.0 feet 469.0 feet Ground Elevation (feet) 479.16 feet 489.02 feet Actual Shaft Diameter (inches) 34.0 inches 30.0 inches Depth to Bearing Stratum - Unweathered hard Gray Limestone (feet) 1.20 feet 8.00 feet Required Pier Depth (using des. pen.) 9.20 feet 13.00 feet Required Pier Depth (using des. elev.) 13.16 feet 20.02 feet Actual Pier Depth 13.90 feet 20.50 feet Actual Pier Penetration 12.70 feet 12.50 feet Pier Location within Tolerance yes yes Pier Plumb within Specifications yes yes Casing Required no no Depth to Top of Casing (" - " (minus) if above ground) na na Depth to Bottom of Casing na na Depth Required Due to Casing na na Water Present in Hole at Concrete Pour no no Pier Bottom Clean yes yes Vertical Bars (number & Size) 8 - #9's 8 - #9's Horizontal Ties (Size & Spacing) #3 spiral #3 spiral Steel Cage Diameter 24.0 inches 24.0 inches Length of Steel Cage 9.6 feet 24.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes yes REMARKS: Pier #10 was redrilled through existing pier concrete due to pier being placed in wrong location on 7 -7 -10. ` pm — ALLIANCE GEOTECHNICAL GROUP R�UAncE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/12/2010 Report Date: 07/15/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Piers Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Pier Drilling Cancellation LAB NO: 87490 TEST RESULTS Report No: 87490 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group went to the above project site to observe drilled pier operations. As scheduled, AGG spoke with Sergio w /NTBC and Jesse w/ATS about when the drilling would start. The contractors stated that they would start in about an hour. The technician was notified that concrete for piers had been cancelled at 1:00 p.m. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Robert P. Nance, Sr. Project Manager