DRILLED PIER INSPECTION REPORT
CLIENT: The City of Coppell REPORT DISTRIBUTION:
PROJECT: Bethel Road Paving & Utility City of Coppell - Keith Marvin, P.E.
AGG REPORT #: 010- 0631 - 87435 -1 City of Coppell - Larry Davis
REPORT DATE: 7/15/10 Freese & Nichols - B. Caleb Thornill, P.E.
INSPECTOR /DATE: 7/9/10 JRJ Paving - Marty Murphy
DRILLING COMPANY: Jerry's Pier Drilling
AGG Pier No. 10 13
Pier Location (grid lines) DS3 -3 DS4 -3
Design Shaft Diameter (inches) 30.0 inches 30.0 inches
Design Penetration (feet) 8.0 feet 5.0 feet
Design Elevation of Bottom of Pier (feet) 466.0 feet 469.0 feet
Ground Elevation (feet) 479.16 feet 489.02 feet
Actual Shaft Diameter (inches) 34.0 inches 30.0 inches
Depth to Bearing Stratum - Unweathered hard
Gray Limestone (feet) 1.20 feet 8.00 feet
Required Pier Depth (using des. pen.) 9.20 feet 13.00 feet
Required Pier Depth (using des. elev.) 13.16 feet 20.02 feet
Actual Pier Depth 13.90 feet 20.50 feet
Actual Pier Penetration 12.70 feet 12.50 feet
Pier Location within Tolerance yes yes
Pier Plumb within Specifications yes yes
Casing Required no no
Depth to Top of Casing (" - " (minus) if above
ground) na na
Depth to Bottom of Casing na na
Depth Required Due to Casing na na
Water Present in Hole at Concrete Pour no no
Pier Bottom Clean yes yes
Vertical Bars (number & Size) 8 - #9's 8 - #9's
Horizontal Ties (Size & Spacing) #3 spiral #3 spiral
Steel Cage Diameter 24.0 inches 24.0 inches
Length of Steel Cage 9.6 feet 24.0 feet
Concrete Placed in Center of Pier Hole with a
Hopper or Inverted Chute yes yes
REMARKS: Pier #10 was redrilled through existing pier concrete due to pier being placed in wrong location on 7 -7 -10.
` pm —
ALLIANCE GEOTECHNICAL GROUP
R�UAncE
G GEOTECHI'IfCRL
GRC?UP
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/12/2010
Report Date: 07/15/2010 Sampled By: Jon Schuler
Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis
Location: Bridge Piers Order Number: Vendor #9176
Contractor: JRJ Paving
Client: The City of Coppell
REPORT: Pier Drilling Cancellation LAB NO: 87490
TEST RESULTS Report No: 87490
Page 1 of 1
As requested, a representative of Alliance Geotechnical Group went to the above project site to observe drilled pier
operations. As scheduled, AGG spoke with Sergio w /NTBC and Jesse w/ATS about when the drilling would start. The
contractors stated that they would start in about an hour. The technician was notified that concrete for piers had been
cancelled at 1:00 p.m.
Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E.
Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
(1 -ec copy)
1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E.
1 -ec JRJ Paving Attn: Mr. Marty Murphy
1 -ec The City of Coppell Attn: Mr. Larry Davis
Respectfully Submitted,
Alliance Geotechnical Group
Robert P. Nance, Sr. Project Manager