Loading...
ST0301A-CR100715T M E - C I T Y - O F COPPELL r o PROJECT- W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03-01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY DAY SUN CLEAR CAST RAIN SNOW To 32 32 -50 50-70 70 -85 85 up Still Mod High Report No Dry Mod (C iaxtid '/ 7 I ' S�Z AVERAGE FIELD FORCE NAME OF CONTRACTOR NON - MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: • yep a te- G D I,•I` vY • • c ap Rc 1 e ' o Al ` t P-211 et L A t o SIGNATURE ENGINEERING DEPT. INSPECTOR