Loading...
WA9903-CS000510 (2)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. L C. FINKLEA, P.E. JOHN R. BAUMGARTNER, P.E. Dallas, Texas 75225-5816 361-0204 Phone (214) 361-7900 May 1 O, 2000 Mr. Kenneth M. 'ffin, P.E. Director of gineering & Public Works City of ppell P.O. ox 478 , Re: Addition of Pump Number 4 to the Village Parkway Pump Station Verification of G.E. Motor Dear Mr. Griffin: In accordance with our request dated May 5, 2000, AUI General Contractors has forwarded the enclosed response from General Electric concerning the condition of the 600 horsepower motor supplied with Pump Number 4. In addition, the contractor has scheduled a meeting with the motor manufacture's representative at the job site to evaluate and confirm the information provided. The meeting is scheduled for Monday, May 15, 2000 at 11:00 a.m. We look forward to seeing you on Monday and are available to discuss this project further at your convenience. P.E. Enclosure Cc: Mr. Glenn Hollowell, P.E. X)~Ei~rry Davis j:\clerical\coppell~1999-153\letters\constXkXmotor verification.doe Ha~ 1~3 0 05/08/20 07: 48a 04: 00 RU I Genera 1 214333~ Contractors 8 1 ~G 1911 OSLIN NATION CO P~GE p.3 o2 2025 W. Beltline Suite 114, CarroLlton, TX 75006 Billy Fuent~s Motor and Ddw SJp~ciadig GE S' upp 14ey 8, 2OOO labil Azzam :)din Nation Co, ~;10 S. Westmoreland f300 )alias, Texas 75237 ! {e: City of ~tl add'ffion of pump #4 and Mr. Gary Henddcks letter dated 5/5/00. i )ear Mr. Azzam, I ~ response to Mr. Hendrlclm's letter dated May 5, 2000. We corffirm the following: The'motor furnished to the City d Coppall model WSK$513AN389M, Serial # ORG083004, e00hp, 1200 rpm, 4160 volt~ ts a brand new motor and was specifically. built for the ~ of Coppell and to Shirnek, Jacol~ & Finklea's specificatior~L This motor was built during the first quarter of 2000, for Oeltn NaUon Co./City of Coppell under Oslin Nation Co. purchase order number DA-02283601-NA. It shipped from our facility, Owertsboro, KY on March 14, 2000. 3. The motor received a routine test. (date recorded is attached) 4. This motor was purchased from GE Supply. GE Supply is the exclusive representative in the state of Texa~ GE Supply is _~_ _.~ to meet wlth the engineer and the CAty of Coppell to answer any questions they may have about Ihe referenced motor. e When the motor arrived at the Job site it was de{ermined that the conduit box was in the standard position (F-l), which the aped~Icatiors drawings called for ~e (F-2) posltioru The motor we~ transported to our authorized service center, Shermoo. Where this - change ~ was accomplished. 6. Again, we confirm that ~is motor is brand new and cardes the full warranty, sincerdy, e Iiy Fuentes iv otor and D~ve Specialist