Loading...
ST0301A-CS100723rate • CITY, COUNTY, STATE • JuiY 2; 2010 °`' ` `'s PACE 3 1 Bethel Project Restricts Denton Tap Traffic Reconstruction of West Bethel Road is now underway, including intersection work at Denton Tap and Bethel Road that will restrict traffic along Denton Tap to a single lane in both directions for up to 40 days, according to a City press re- lease. The City said motorists are SA RM Auto Insurance n Discounts un to A A A encouraged to use alternate routes to avoid delays, and should obey all signage in the area. . The larger project consists of removal of the existing asphalt see TRAFFIC on page 7 0 %ARAC'T/1 ^ion I photo by Haley Moore Workers lay pavement for new turn lanes on Bethel Road at Denton Tap. The City said two lanes of both northbound and southbound Denton Tap will be closed for up to 40 days, as part of improvements to Bethel Road. TRAFFIC from page 3 roadway on Bethel Road, installa- tion of improved drainage, new con- crete paving with curbs and gutters, construction of a new bridge over Grapevine Creek, and a continuous sidewalk along the south side of the road. The project will greatly improve the intersection of Denton Tap and Bethel Road, according to Keith Marvin, project engineer for the City of Coppell. Both left and right turn lanes will be added to the eastbound leg of Bethel Road, and the westbound lane will be widened. The contractor is required to maintain access to adjacent proper- ties during all phases of construc- tion activity. Appropriate signage and barri- cades were erected prior to the projects beginning, allowing motor- ists to plan routes around the con- struction area. The City Council awarded the construction contract to JRJ Pav- ing, LP, in the amount of $1,969,019.05. For more information about the project, contact Marvin at 972 -304- . 3681.