Loading...
ST0301A-LR100720 -- Consulting Engineering * Geotechnical Engineering * Construction Materials El.p fLLIfMCE 3228 Halifax Street, Suite A, Dallas, Texas 75247 GEOTECHNICFIL Phone: (972) 444 -8889 Fax: (972) 444 -8893 GROUT Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/09/2010 Report Date: 07/20/2010 Sampled By: Schuler, Jon Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Pier DS3 -3 Order Number: Vendor #9176 Contractor: JRJ Paving Number of Client: The City of Coppell Specimens: 4 REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 87435 Material: CONCRETE Test Method: See Below TEST RESULTS Report No: 87435 Page 1 of 1 Maximum Compressive Average Spec Age Tested Diameter Area Load Cure Strength Strength Nbr (days) (in) (in (Ibs) Break Type Loc (PSI) (PSI) Comments A 7 6.00 28.27 116,910 Type 4 Lab 4,130 4,130 B 28 6.00 28.27 Lab C 28 6.00 28.27 Lab D HOLD (see remarks) - D s ks Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Specification: 3,600 psi @ 28 days Date Received: 07/10/2010 Slump: 8.0 Inches Transported By: LMC Curing Method: Standard Air Content: 1.2% Source /Sampled At: Truck / Center Time Sampled: 11:30 am Plant: LMC Temp.: Ambient: 88 °F Mix: 93 °F Mix Code: Truck/Ticket No: Quantity Represented: 1.75 cu. yds. at 3.5 cu. yds. placed of a 3.5 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ATM C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Charge: The City of Coppell Attn Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn Mr. Keith Marvin, P E Respectfully Submitted, (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. Alliance Geotechnical Group 1 -ec JRJ Paving Attn: Mr. Marty Murphy / ' �^° ,$ 1 -ec The City of Coppell Attn. Mr. Larry Davis / ' ,. , Robert P. Nance, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/14/2010 Report Date: 07/20/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Stockpile Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Soils Attachment LAB NO: 87809 Test Method: See Below TEST RESULTS Report No: 87809 Page 1 of 1 Attached is the proctor report. Remarks: See attached report. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager MOISTURE DENSITY RELATIONSHIP REPORT 123 118 1 + 113 U Q C U 0 108 ZAV for Sp.G. _ 103 2.65 98 6.5 9.0 11.5 14.0 16.5 19.0 21.5 Water content, % Test specification: ASTM D 698 -00 Procedure A Standard Elev/ Depth Classification Nat. Moist. Sp.G. LL PI % > No.4 % < No.200 USCS AASHTO 30 15 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 114.9 pef Optimum moisture = 13.3 % ORANGEISH YELLOW & LIGHT BROWN CLAYEYSAND Project No. C10 -0631 Client: The City of Coppell Project: Bethel Road II • Location: STOCKPILE (SAMPLED 07 -14 -2010) Remarks: C10- 0631 -87809 AGG Figure 8052 MOISTURE DENSITY RELATIONSHIP REPORT ALLIANCE GEOTECHNICAL GROUP RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/14/2010 Report Date: 07/20/2010 Sampled By: Schuler, Jon Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Texas Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Soils Attachment LAB NO: 87668 -1 Test Method: See Below TEST RESULTS Report No: 87668 -1 Page 1 of 1 Remarks: See attached report. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 10610 Newkirk Street, Suite 202, Dallas, Texas 75220 Phone :972- 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: The City of Coppell PROJECT: Bethel Road Paving & Utility AGG REPORT #: C10- 0631 - 87668 -1 REPORT DATE: 7/20/2010 INSPECTOR/DATE: 7/14/2010 DRILLING COMPANY: ATS REPORT DISTRIBUTION: City of Coppell - Keith Marvin, P.E. City of Coppell - Larry Davis Freese & Nichols - B. Caleb Thornill, P.E. JRJ Paving - Marty Murphy AGG Pier No. 1 2 3 Pier Location (grid lines) DS1 -1 DS1 -2 DS1 -3 Design Shaft Diameter (inches) 30.0 inches 30.0 inches 30.0 inches Design Penetration (feet) 5.0 feet 5.0 feet 5.0 feet Design Elevation of Bottom of Pier (feet) 469.0 feet 469.0 feet 469.0 feet Ground Elevation (feet) 495.11 feet 495.03 feet 494.86 feet Actual Shaft Diameter (inches) 30.0 inches 30.0 inches 30.0 inches Depth to Bearing Stratum - Hard unweathered gray Shale (feet) 13.20 feet 12.10 feet 14.70 feet Required Pier Depth (using des. pen.) 18.20 feet 17.10 feet 19.70 feet Required Pier Depth (using des. elev.) 26.11 feet 26.03 feet 25.86 feet Actual Pier Depth 26.40 feet 26.50 feet 27.00 feet Actual Pier Penetration 13.20 feet 14.40 feet 12.30 feet Pier Location within Tolerance yes yes yes Pier Plumb within Specifications yes yes yes Casing Required no no no Length of Casing n.a. n.a. n.a. Depth to Top of Casing (" - " (minus) if above ground) na na na Depth to Bottom of Casing na na na Depth Required Due to Casing na na na Water Present in Hole at Concrete Pour no no no Pier Bottom Clean yes yes yes Vertical Bars (number & Size) 849's 849's 849's Horizontal Ties (Size & Spacing) #3 spiral #3 spiral #3 spiral Steel Cage Diameter 24.0 inches 24.0 inches 24.0 inches Length of Steel Cage 24.0 feet 24.0 feet 24.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes yes yes 0 - 11 d ►h] ALLIANCE GEOTECHNICAL GROUP RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/17/2010 Report Date: 07/20/2010 Sampled By: Alvin Pointer Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bethel Road Coring Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Concrete Coring LAB NO: 87822 TEST RESULTS Report No: 87822 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group, was present at the above referenced project to core 5 locations on the east side of Bethel Road. Locations are as follows: 1) 8 1/8" 2) 11 1/4" 3) 17 1/8" 4) 12 1/4" (broke core - unable to retrieve broken pieces) 5) 21" Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager