Loading...
ST0301A-CR100720T H E - C I T Y - O F COPPELL r o PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase 11 -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY SUN CLEAR VERCAST RAIN SNOW To 32 32 -50 50 -70 70 -85 85 Still Mod High Report No Dry Mod d DAY M T W T F S S AVERAGE FIELD FORCE NAME OF CONTRACTOR L' )�f I L/ NON- MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION .ACTIVITIES: CL �— S S 6 CN SIGNATURE ENGINEERING DEPT. INSPECTOR