Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST0301A-CR100723
T H E C I T Y O F COPPELL T W�l l PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND H U`MlDTY DAY SUN CLEAR OVERCAST RAIN SNOW To 32 32 -50 50 -70 70 -85 85 Still Mo High Report No Dry 14 od Humid ,�vvv ©rte® AVERAGE FIELD FORCE NAME OF CONTRACTOR jIZ -) NON- MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: G SIGNATURE ENGINEERING DEPT. INSPECTOR