Loading...
ST9301-CS060216 Page 1 of 1 Ken Griffin - Re: ST-93-01 From:   "Katie Bradley" <kbradley46@comcast.net> To:   "Ken Griffin" <kgriffin@ci.coppell.tx.us>     Date:2/16/2006 12:10 PM     Subject:Re: ST-93-01   thank you so much for the information.  I appreciate your help. ----- Original Message ----- From: Ken Griffin To: Katie Bradley Sent: Thursday, February 16, 2006 11:42 AM Subject: Re: ST-93-01 Ms. Bradley   I'm sorry for the inconvenience that you and others are experiencing driving east Sandy Lake.  The contractor is continuing to work on the wall on the north side of Sandy Lake at the culverts.  The wall is below the level of the road so the workers are not typically visible to passing motorists.  That wall will hold up the remaining paving on the road.  Once the wall is complete, the remaining paving on the north side can be completed and then traffic switched.   The following is the latest timeline obtained from the contractor on 2/14/06:   1) Contractor should complete the wall by 2/20/06; 2) Contractor should complete the left out paving by 3/306: 3) Contractor should switch traffic to new paving during spring break (3/13 - 3/17).   Once traffic is switched, the contractor will fill the south side of the road and pave it.  The contractor anticipates completing the project late summer 2006.   If you have any additional questions please feel free to contact me at your convenience.   Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgriffin@ci.coppell.tx.us >>> "Katie Bradley" <kbradley46@comcast.net> 2/15/2006 2:41 PM >>> According to city website on construction some parts of this road should be done by now.  I must drive this road at least 2 times a week or more and I NEVER see anyone working on the 1 mile stretch east of MacArthur.   Is this 1 mile road replacement still on the schedule list on the city's website. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4B4B5B36City_...7/27/2010