Loading...
ST9301-CS070108 Page 1 of 2 Ken Griffin - Fwd: RE: Traffic Counts Sandy Lake From:Ken Griffin     To:Paula Crocker     Date:1/8/2007 2:55 PM     Subject:Fwd: RE: Traffic Counts Sandy Lake       >>> "Matt McCulloch" <mcculloch@cjhensch.com> 1/8/2007 11:10 AM >>> Ken,   76-0582628. We plan to install these locations tomorrow AM. Our tax ID number is:   Thanks, Matt   Matt McCulloch C J Hensch & Associates, Inc. 209 E. Pioneer Drive Irivng, Texas 75061 P:  (214) 492-6300 F:  (214) 441-0197 From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Monday, January 08, 2007 9:40 AM To: mcculloch@cjhensch.com Cc: Paula Crocker Subject: RE: Traffic Counts Sandy Lake   Mr. McCulloch   Thanks for your response.  Your original email with the sample got caught by our spam software, but I eventually found it.  I would like to have you go ahead and perform the counts and speed study.  To ensure that we get you set up in our vendor system for payment, I do need your tax ID number.   If you have any questions please contact me at your convenience.   Ken Griffin, P. E. >>> "Matt McCulloch" <mcculloch@cjhensch.com> 1/5/2007 5:36 PM >>> Ken, Attached is the cost estimate for the job we discussed earlier. Please contact me if you have any questions. Thanks, Matt Matt McCulloch C J Hensch & Associates, Inc. 209 E. Pioneer Drive Irivng, Texas 75061 P:  (214) 492-6300 F:  (214) 441-0197 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\45A25B50City_...7/27/2010 Page 2 of 2 From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Friday, January 05, 2007 2:56 PM To: Matt McCulloch Cc: Paula Crocker Subject: Traffic Counts Sandy Lake   Mr. McCulloch   I've attached a PDF which shows the general locations that speed and volume data is needed.  If possible, I would still like to review your end product before I give the final go ahead to perform these counts.  Also, as I'm sure you are aware, all our counts are performed on a Tuesday, Wednesday or Thursday, when school is in session.   If you have any questions, please contact me at your convenience.   Thanks    Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgriffin@ci.coppell.tx.us file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\45A25B50City_...7/27/2010 Cost Estimate C J Hensch & Associates, Inc. 209 E. Pioneer Drive Irving, Texas 75061 To: Ken Griffin Request Date: July 27, 2010 City Of Coppell Project #: 07-012-D 255 Parkway Blvd. P.O. Box 9478 Total: $343.76 Coppell, TX 75019 RE: E Sandy Lake Traffic Counts Types of Count(s) Requested: Quantity Price Total each Machine Count Arterial # of Hours:24 Class Speed 0 @ $0.00 $0.00 Arterials # of Hours:24 Bi-directional Class Speed 2 @ $160.00 $320.00 Mainlane # of Hours:24 Class Speed 0 @ $0.00 $0.00 Frontage Rd # of Hours:24 Bi-directional Class Speed 0 @ $0.00 $0.00 TMC Hours:4 0 @ $0.00 $0.00 Speed Study # of Cars/Duration:125/2hrs. 0 @ $0.00 $0.00 Intersection Diagram 0 @ $0.00 $0.00 Intersection Photographs 0 @ $0.00 $0.00 Administrative Fee 0 @ $0.00 $0.00 Supervisory Fee 0 @ $0.00 $0.00 Custom (Please Specify):Mileage 53.40 @ $0.445 $23.76 Total $343.76 Count Locations: 1) Speed Study - E Sandy Lake Rd between S MacArthur Blvd and Starleaf St 2) Speed Study - E Sandy Lake Rd East of Riverview Dr Prices are based on our best estimate and are subject to change.