Loading...
PA0101-LR010515CONCRET~ COMPRESSIVE STRENGTH TEST 8901 Carpenter FP..,5,.. Suite #t 00 Report Number: 94011093.0008 Dallas. Texas 75247 Service Date: April 24, 2001 (,214) 63O-lOlO Client: City of Coppell - Parks & Recreation Report Date: May 15, 2001 Attn: Brad Reid Project: Andrew Brown Park East 732 DeForest Moore Road Coppell TX 75019 Coppell. Texas Project Number: 94011093 Material Information Sample Information Specified Strength: 3000 psi ~ 28 Days Sample Time: 12:25pm Technician: Terry L. Smith Batch Time: 12:07pm Plant: 41 Weather Conditions: Clear, windy Supplier: TXI Accumulative Yards: 4 Truck No: Ticket No: 2871036 Placement Method: Direct discharge Mix I.D. No.: 8272 Sample Locations: See placement location Placement Location: Paving- Parking (See attached sketch) Field Test Data Test Result Specification Test Method Slump. inches: 6.00 5.0 Max ASTM C-143 Air Content. %: ASTM C-172 Concrete Ternperature. o F: 74 ASTM C-39 Ambient Temperature.',: F: 79 Plastic Unit Weight, pcf: Laboratorv Test Data Age at Maximum Compressive Set Specimen Diameter Date Test ,.,,- L~arJ Strength No. ID (inches) Tested ' (lbs) ..... ~..~,,, I 1 6.00 05/01/2001 1 2 600 05..'01!2001 7 78.300 2~7~0.0...,,/' '" ...... Avcra§~ ......... ~,750 1 3 05/22/2001 28 1 4 05/22/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests ',,,ere pecformed m ge:~erai accordance .,'dth appiicable ASTM test methods. Tins repo,"t ~s exc:ds~ve!y for me use of the client md~oated above and shal', not De reproduced excep: ~n fu!; w~thout the written apprc'.,a', of Terraccn Test results transrn:tted herein are only applicable to the actual sampies tested at the Iocat'o.".is'i referenced and are not necessarily ~nd~cative of the prope,t~es of other apparently s~milar or identical materials Page ~ of 3 CONCRETE COMPRESSIVE STRENGTH TEST ~o~,:,.~,~.o,~i...=. 8901 Carpenter Frwy., Suite #100 Report Number: 94011093.0008 Dallas, Texas 75247 Service Date: April 24, 2001 (214) 63O-lOlO Client: City of Coppell - Parks & Recreation Report Date: May 15, 2001 Attn: Brad Reid Project: Andrew Brown Park East 732 DeForest Moore Road Coppell TX 75019 Coppell, Texas Project Number: 94011093 Material Information Sample Information Specified Strength: 3000 psi @ 28 Days Sample Time: 3:05pm Technician: Terry L. Smith Batch Time: Plant: 41 Weather Conditions: Clear Supplier: TXl Accumulative Yards: 220 Truck No: 867 Ticket No: 2871361 Placement Method: Direct discharge Mix I.D. No.: 8272 Sample Locations: See page 1 Placement Location: See page 1 Field Test Data Test Result Specification Test Method Slump, inches: 6.00 5.0 Max ASTM C-143 Air Content, %: ASTM C-172 Concrete Temperature, o F: 76 ASTM C-39 Ambient Temperature, o F: 79 Plastic Unit Weight, pcf: Laboratorv Test Data Age at Maximum Compressive Set Specimen Diameter Date Test Load Strength No. ID (inches) Tested (days) (lbs) (psi) 3 1 6.00 05/01/2001 7 94,790 3,350 3 2 6.00 05/01/2001 7 94,130 3,330 Average 3,340 3 3 05/22/2001 28 3 4 05/22/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Report Distribution: nc. (1) City of Coppell - Parks & Recreation (1) TLB Construction Reviewed by: (1) city of coppell - Constr. Insp. w ~E1:ic J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 3 : ........ :'-=----' .... GEOTECHNiCAL AND E~ F~I ~-1 I I l== ENVIRONHENtaL CONSULTANTS Coppell Tach Center II 1322 Crestside Coppell, Texas REPORTED TO: Bob Moore Construction Co. REPORT NO. 110 1110 N. Watson Road REG PROJECT NO. 7044 Arlington, Texas 76011 SAMPLE DATE: 05-15-01 A-I-TN: Mr. Ed T. McGuire TECHNICIAN: F. Steadman CONTRACTOR: Bob Moore Construction Co. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 20'N, 35'W of N.E. building corner 70/390 2 Paving: 25'N, 90'W of N.E. building corner 170/390 3 Paving: 25'N, 60'E of N.W. building corner 270/390 4 Firelane: 10'S, 20'W of approach off Lakeshore Drive 340/390 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. TXI 8273 4000 Test Results Set Cylinder Age(~ I Total Load [ CompressiveI Average No. ID Date Tested Test I I IIbs- Strength p.s.i. Strength p.s.i. I 7620 05-22-01 7 122470 4330 7620 05-22-01 7 123360 4370 4350 7620 06-12-01 28 7620 06-12-01 28 7620 Hold H 2 7621 05-22-01 7 102780 3640 7621 05-22-01 7 106150 3760 3700 7621 06-12-01 28 7621 06-12-01 28 7621 Hold H 3 7622 05-22-01 7 99180 3510 7622 05-22-01 7 99600 3520 3520 7622 06-12-01 28 7622 06-12-01 28 7622 Hold H 4 7623 05-22-01 7 97810 3460 7623 05-22-01 7 99420 3520 3490 7623 06-12-01 28 7623 06-12-01 28 7623 Hold H 2424 STUTZ DR. ,, SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data Set Cylinder r Time of I Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 7620 5.50 8:25AM 74 82 5.0 2889238 2 7621 5.25 10:30AM 78 82 4.0 2889501 3 7622 5.00 12:55PM 88 86 4.1 2889733 4 7923 5.25 3:00PM 88 86 4.0 2889986 Mail Submitted by: Distribution: (1) Bob Moore Construction Co./ Mr. Ed T. McGuire REED ENGINEERING GROUP, INC, (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Original Signed By (1) McHale Consulting Engineering/ Mr. Gary McHale Keith Atkins (1) CMC-Commercial Realty/ KEA/je Mr. Steve Huff (1) AECC, Inc./Mr. Chad Stevens