Loading...
ST0301A-LR100726 (2)RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/19/2010 Report Date: 07/26/2010 Sampled By: Jon Schuler Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Concrete Cancellation Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Daily Field Activity LAB NO: 87830 TEST RESULTS Report No: 87830 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group, went to the project site for a 2:00 pm concrete pour for a column. AGG Technician spoke with contractor and City of Coppell Inspector Larry David. The contractor informed AGG that no concrete would be placed today. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager