Loading...
ST0301A-LR100729 (2)R�UAncE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/23/2010 Report Date: 07/29/2010 Sampled By: Aaron Allen Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Aerial Support Piers Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Pier Verification by Geotechnical Engineer LAB NO: 88274 TEST RESULTS Report No: 88274 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group, went to the project site to observe Pier Drilling operations at two piers along the bottom of the creek. Requirement piers were drilled a minimum of ten (10) feet below the bottom of the creek, per City of Coppell. Casing was required to seal off the piers from groundwater at the surface of the creek bottom. Due to the length of the casing, both piers were drilled approximately fifteen (15) to seventeen (17) feet below the bottom of the creek. Gray shale was encountered very near the bottom of the creek. No plans were provided or available at the time of the pier inspection. Charge: The City of Coppell Attn: Mr. Keith Marvin P.E. Respectfully Submitted, Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1- eccopy) Alliance Geotechnical Group 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Robert P. Nance, Sr. Project Manager RLLIHnCE G GEOTECHI'IfCRL GRC?UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/21/2010 Report Date: 07/29/2010 Sampled By: Alvin Pointer Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Eastside of Bethel Road Order Number: Vendor #9176 Contractor: JRJ Paving Number of Client: The City of Coppell Specimens: 6 REPORT: Drilled Cores LAB NO: 88099 Material: Drilled Cores Test Method: See Below Ell ED 9 R TEST RESULTS Report No: 88099 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Pagel of 2 CORE DATA Length Before After Before Cap Cap Diameter Trimming Length Length NbrCore Location (in) (in) (in) (in) Area 1 Core #2 4.00 6.7 6.6 6.8 12.57 2 Core #3 3.99 6.2 5.7 6.0 12.50 3 Core #3A 4.00 7.4 6.1 6.3 12.57 4 Core #4 3.99 6.9 6.5 6.6 12.50 5 Core #5 3.99 8.4 5.9 6.1 12.50 6 Core #5A 3.99 7.6 7.7 7.9 12.50 TEST DATA Maximum Compressive Average Direction Age Tested Load L/D Strength Strength of Load to Moisture Nbr (days) (Ibs) Break Type Factor (PSI) (PSI) Placement Condition 1 4 63,620 Type 4 0.98 4,940 Perpendicular Conditioned 2 4 54,885 Type 3 0.96 4,220 Perpendicular Conditioned 3 4 19,150 Type 3 0.97 1,470 Perpendicular Conditioned 4 4 66,885 Type 3 0.97 5,200 Perpendicular Conditioned 5 4 44,115 Type 4 0.96 3,400 Perpendicular Conditioned 6 4 17,540 Type 3 1.00 1,400 3,440 Perpendicular Conditioned Ell ED 9 R F111 F] Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/21/2010 Report Date: 07/29/2010 Sampled By: Alvin Pointer Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Eastside of Bethel Road Order Number: Vendor #9176 Contractor: JRJ Paving Number of Client: The City of Coppell Specimens: 6 REPORT: Drilled Cores LAB NO: 88099 Material: Drilled Cores Test Method: See Below TEST RESULTS Report No: 88099 Page 2 of 2 Date Received: 07/17/2010 Transported By: Remarks: Test Method (As Applicable): ASTM C39, C42, C174, Reference ACI -318 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893 DRILLED CORE REPORT I CLIENT: City of Coppell REPORT DISTRIBUTION: PROJECT: Bethel Road City of Coppell - Keith Marvin, P.E. AGG REPORT #: C10- 0631 - 88099 -1 City of Coppell - Larry Davis REPORT DATE: 07/29/10 Freese & Nichols - B. Caleb Thornill, P.E. INPECTION DATE: 07/21/10 JRJ Paving - Marth Murphy Core #1 HMAC C Mix 2.3" HMAC D Mix 2.85" Concrete 2.53 Core #2 HMAC C Mix 1.99" HMAC D Mix 2.42" Concrete 6.74" Core #3 HMAC C Mix 1.75" HMAC D Mix 2.2" Concrete 6.2" CTB 7.4" Core #4 HMAC C Mix 1.9" HMAC D Mix 2.1" Concrete 6.9" CTB 1.4" Core #5 HMAC C Mix 2.0" HMAC D Mix 1.4" Concrete 8.4" CTB 7.6" ,,-/ , ALLIANCE GEOTECHNICAL GROUP Note: This report is for the exclusive use of the client addressed. This report may not be reproduced, except in its entirety without the written consent of AGG. Results apply only to above tests.