Inspection Report FormErosion and Sediment Control Inspection Report Form
Project Name and /or Location
Weather:
Pollution Control Measures (BMP) Checklist:
Items checked are used on this site
Following Erosion Control Plan
Rain in last 24 Hrs. (inches)
Owner / Permitee
NOI / S WPPP on site?
A. Current Construction / Active Areas:
B. Problem Areas / Special Observations:
Inlet Protection
Sediment Protection (Check Damns)
Stabilized Construction Entrance
Perimeter Controls (Silt Fence)
Wash -out Area
Soil Stabilization (seed, hydromulch, etc.)
Dust Control (water trucks)
General Site Conditions (Trash, etc.)
Spoil Piles in proper locations
BMP I Location I Observations / Corrective Actions
C. Have Items on last inspection been corrected? Yes No N/A (if No, Explain:)
Note: Inspection comments above indicate deficiencies only. Deficiencies must be corrected within 7 days, unless
otherwise noted. All other BMP's are considered to be in good working condition.
Date of Inspection:
Inspectors Signature:
Responsible Person Signature: