Loading...
Old Town-MP1004161701 N Market St., #8500, LB51 • Dallas, Texas 75202 • 214 - 217.2200 • fax 214. 217 -2201 www.freese.com PROJECT NO.: CPL09446 DATE: 4/16/2010 PROJECT: Old Town Coppell Infrastructure Improvements TO: Ken Griffin, Keith Marvin, Mindi Hurley FROM: Tricia Hatley, P.E. CC: CPL09446 3.1; DRP, DT, GMM, CRE, DSB PROJECT UPDATES Held project team meeting on Monday, April 12 at City Hall to review 30% plans /scope. A number of issues were discussed and direction given to FNI. Following is a summary of some of the key decisions: • Plat should be updated to reflect the town home lot outline for the southern block. Main Street ROW should be adjusted to remove the triangle wedge between the sidewalk and the lots. • FNI should submit a preliminary plat showing all of the lots and a final plat of just the ROW and city tracts. Planning department intends to handle these simultaneously through P &Z. • The City confirmed various design elements of the Park and discussed coordination between the infrastructure plans and the park plans. Features will be detailed on the 60% plans for further comment by the Parks Dept. • City will be maintaining the landscaping for North Main Street, east side of Burnett and the area around the square directly adjacent to the park. Each business will be responsible for irrigating the landscaping adjacent to their property. We will provide one stub out and meter for each business area. • City wants their standard median landscaping used for the North Main Street section. Landscape design for the development should be consistent with this Coppell standard. City directed FNI to use the Transystem's Bethel plan as an example. • Engineering staff is interested in root barriers or other options to minimize future damage to the pavement from the tree plantings. • City would prefer detailed irrigation plans for the streetscape areas (versus a performance spec). • City wants power at each tree well within the city maintained areas for future use. The developer is not interested in power in the tree wells for the privately maintained areas. • City provided comments on the water and sewer line design. • Utilities for the proposed Bethel should be included where Bethel paving is included in this project. • City agrees with placement of HC spaces using zones. • Group discussed parking requirements and FNI was informed that ample parking is available for the development. • City provided comments on drainage design and curb inlet placement. • City wants to use the New York style lighting with smaller pole bases. We'll coordinate with Caleb and Keith as our electrical engineer starts his design work. W TASKS AND DELIVERABLES is • FNI will send sketches of sidewalk options for the Houston St connection to South Coppell. • FNI to recommend options for methods to minimize damage to pavements from tree roots. Jessica Brown, FNI, to review development plans and city water model to determine required sizing for water lines. UPCOMING SUBMITTALS AND MEETINGS • Preliminary and Final Plats — week of April 26th • 60% plans to City by May 21 ADDITIONAL INFORMATION • Additional information regarding irrigation system design was provided by Brad Reid via email to FNI. • Review of Hammond design plans shows that drainage system was designed for 5 year storm. FNI is working on design to determine if the system is sized to accommodate flow from the development as planned and based on current city criteria. This may generate further discussion with City regarding drainage design.