Loading...
ST8703-CS 900123COPPELL PUBLIC WORKS -44110— MEMORANDUM DATE: January 990 TO: Russel e, City Engineer FROM: Larr Davis, Construction Inspector RE: Samuel Blvd. at Parkway Blvd. (Tickler File Dated 1116189) After receiving complaints from Mrs. Mary Katherine and Mrs. Gerry Strom concerning existing parking along Samuel Blvd., from Parkway Blvd. to Sandy Lake Rd., causing a through traffic hinderance during construction of Meadows VI and Samuel Blvd., action was taken on November 3, 1989 by myself and Alan Blankenship (L. H. Lacy) to request local residents suspend parking in the construction area until construction was completed. Local residents complied with the temporary no parking within the three days of request. If you need any further information, please let me know. CLD/ SAMUEL.CLD