Old Town-MP100525I TO: Ken Griffin, P.E.; Keith Marvin, P.E. CC: Mindi Hurley, Brad Ried FROM: Tricia Hatley, P.E.; Chris Pote SUBJECT: Old Town Coppell — Franchise Utility Coordination DATE: May 25, 2010 The following is an update on franchise utilities for Old Town Coppell: 1. Oncor : a. Contacts: Rick Fielding (lighting) and Karen Eastman b. Update: L David Beckman (FNI electrical engineer) has been working with Rick Fielding on all of the electrical issues. We have made progress in our discussions regarding street lighting issues, but we've had limited success in discussions on the overall feed plan for the development and ONCOR requirements for providing service. We are continuing discussing with them in hopes that we can include infrastructure plans as needed. ii. David Beckman has submitted 60% lighting plans 2. Atmos: a. Contact: George Long b. Update: i. Gas has been located on South Coppell Rd, Bethel Rd, and Burns St to serve the site ii. Gas can be brought in from South Coppell Rd or Bethel Rd. iii. No duct bank would be required. May require crossing if not installed during development phase. Atmos can joint trench with other utilities such as electric, cable, or phone. iv. No above ground easements required,. Just underground where gas is not in ROW. v. Atmos normally runs gas line behind curb in ROW. If gas line is not run within ROW then a 10' utility easement is required vi. Further discussions with Atmos are needed to avoid cuts in pavement and sidewalk for future installations. FNI will continue these discussions as we advance the design plans. 3. Verizon: a. Contact: Luis Comas b. Update: i. Verizon has provided an exhibit showing that they want to feed the site from South Coppell and Houston Rd. They anticipate using ROW, but will need a 4" conduit path shown in their exhibit. 1701 N Market St., #500, LB51 • Dallas, Texas 75202 • 214- 217 -2200 • fax 214- 217 -2201 vvvdiho,fre•ese.coni Page 2 of 2 ii. If the 4" conduit path is not provided, then there will need to be a utility easement for Verizon to reside in. iii. FNI will coordinate this work into the plans as we advance the design. If there are additional franchise utility companies that the city typically deals with, please let us know and we will contact them. Please let me know if you have any questions about this update.