ST8703-CS 890929 P.02 Sep 29,89 1~:31 HORTON AND TOMNITZ, INC. " 2221 EAST LAM. AR I]OULEVARD. SUITE 950 ~t ! ?-6404q~.00 I September 29, 1989 Mr. Alan Ratliff, City Manager city of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Update on Samuel Blvd. Construction Dear Mr. Ratliff: Russell Doyle asked me to write you concerning the delay in our completion of the paving improvements to Samuel Boulevard. As you know, construction delays are costly and benefit no one, but we have been unable to avoid them. At this point, two factors have contributed to the construction schedule for Samuel being moved back. First of all, the utility contractor is under contract with the M.U.D. Unfortunately, we have no control over his efficiency or scheduling. We have been requesting him to utilize two crews on the job since he started, but he has not complied. This is very frustrating to have a lack of control over something that we are paying for. Secondly, we did lose six working days due to rain and wet soil. I have been on the job during the morning and afternoon periods when school is starting and letting out. Even when we had Samuel Blvd. rerouted, buse~ and cars were moving in and out of the school without any apparent problems. As it stands right now, the paving contractor will move on to the Job on October 10. This is the "outside date" that the utility contractor has given me by which he will be finished with the storm sewer construction under Samuel Blvd. This is the section of pipe that the City had added to our plans, obviously, the paving contractor has been instructed to begin the operation with the Samuel Boulevard improvements. FORWA?d)ED TO MAYOI~/kN'~D COUNCIL DATE: Sep ':2'9,89 14:?,2 P.03 i Mr. Alan Ratliff, City Manager :i Page 2 ,: September 29, 1989 . .! Please let me know if there is any further information that I can provide to you regarding this matter. Sincerely, oraon Vice President GDJ/pm Cc: Russell Doyle