Loading...
ST0301A-LR100802  øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ     ø÷ ø÷ åøëõøçõ   øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ   ø÷ ø÷ åøëõøçõ   øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ   ø÷ ø÷ åøëõøçõ  êëöçôåô øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ  ø÷ ø÷  åøëõøçõ êëöçôåô øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ    ø÷ åøëõøçõ êëöçôåô øáðìäìêìéçôææðãôãôçøòô êøõåçôëòåñåçôëòåñ éôöðøìôåôççôøäçô ÷ç êö êììôëåæ  ø÷ ø÷  åøëõøçõ Consulting Engineering * Geotechnical Engineering * Construction Materials fiLLifiNCE 3228 Halifax Street, Suite A, Dallas, Texas 75247 GEOTECHNIOIL Phone: (972) 444 -8889 Fax: (972) 444 -8893 G; our Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/29/2010 Report Date: 08/03/2010 Sampled By: Robert Nance Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Bridge Abutment #1 Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Reinforcing Steel Inspection LAB NO: 88459 TEST RESULTS Report No: 88459 Page 1 of 1 We visually inspected the reinforcing steel at the Bridge Abutment #1. Our inspection included verifying the proper size of the reinforcing steel including diameter, length, bends and anchorage, and the grade and the location of the bars including spacing and cover. We also verified proper splicing, checked stability of tying, and checked the reinforcing steel for excessive rust deposits. On the basis of our visual inspection, the reinforcing steel placement meets the requirements of the project plans and specifications. • Size: 6 - #11's • Cover: 2" • Splice Length: NA • Cleanliness: Clean • Properly Tied: Yes • Cleanliness of Form Work: Clean • Proper Support: Yes Remarks: Plan Sheet ST3 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, (1- eccopy) Alliance Geotechnical Group 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis } Robert P. Nance, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.