Loading...
ST0301A-LR100801RuUAncE G cEorEcnrocAL Cffi UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C10 -0631 Date Sampled: 07/23/2010 Report Date: 08/01/2010 Sampled By: Troy Gaither Project: Bethel Road Paving & Utility Improvements By Order Of: Larry Davis Location: Piers Order Number: Vendor #9176 Contractor: JRJ Paving Client: The City of Coppell REPORT: Soils Attachment LAB NO: 88132 -1 Test Method: See Below TEST RESULTS Report No: 88132 -1 Page 1 of 1 Remarks: See attached report. Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -ec copy) 1 -ec Freese & Nichols, Inc. Attn: B. Caleb Thornhill, P.E. 1 -ec JRJ Paving Attn: Mr. Marty Murphy 1 -ec The City of Coppell Attn: Mr. Larry Davis Respectfully Submitted, Alliance Geotechnical Group Y 4 . 9-- Robert P. Nance, Sr. Project Manager ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 3228 Halifax Street, Dallas, Texas 75247 Phone: 972 - 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: The City of Coppell PROJECT: Bethel Road Paving & Utility AGG REPORT #: C10- 0631 - 88132 -1 REPORT DATE: 7/29/10 INSPECTOR /DATE: Troy Gaither - 07/23/10 DRILLING COMPANY: B & K REPORT DISTRIBUTION: City of Coppell - Keith Marvin, P.E. City of Coppell - Larry Davis Freese & Nichols - B. Caleb Thornill, P.E. JRJ Paving - Marty Murphy Pier Location (grid lines) East West Design Shaft Diameter (inches) 24.0 inches 24.0 inches Required Pier Depth Below Bottom of Creek (feet) 10.0 feet 10.0 feet Depth of Creek Bottom Below Existing Grade (feet) 4.5 feet 5.0 feet Ground Elevation (feet) 100.00 feet 100.00 feet Actual Shaft Diameter (inches) 24.0 inches 24.0 inches Required Pier Depth Depth Below Existing Grade (feet) 14.5 feet 15.0 feet Actual Pier Depth 15.8 feet 15.4 feet Pier Location within Tolerance yes yes Pier Plumb within Specifications yes yes Casing Required yes yes Length of Casing 16.0 feet 16.0 feet Depth to Top of Casing (" - " (minus) if above ground) -1.0 -1.0 Depth to Bottom of Casing 15.0 feet 15.0 feet Required Pier Depth due to Casing (feet) 15.0 feet 15.0 feet Water Present in Hole at Concrete Pour no no Pier Bottom Clean yes yes Vertical Bars (number & Size) 8 - #7's 8 - #7's Horizontal Ties (Size & Spacing) #4 @ 12" #4 @ 12" Steel Cage Diameter 18.0 inches 18.0 inches Length of Steel Cage 10.0 feet 10.0 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute yes yes KtMAKK5: I here were no plans or specifications available for these piers. As directed by the Project Superintendent, these piers were to be drilled to depths of 10' below the bottom of creek bed and that penetration into the bearing stratum below the bottom of casing was not required. ALLIANCE GEOTECHNICAL GROUP