Loading...
WA9903-CS000510 (3)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 RONALD V. CONVqAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. I. C. FINKLEA, P.E. JOHN R. BAUMGARTNER, P.E. Dallas, Texas 75225-5816 Transmitted via Facsimile Fax (214) 361-0204 May 10,2000 Phone (214) 361-7900 Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Addition of Pump Number 4 to the Village Parkway Pump Station Verification of G.E. Motor Dear Mr. Griffin: In accordance with our request dated May 5, 2000, AUI General Contractors has forwarded the enclosed response from General Electric concerning the condition of the 600 horsepower motor supplied with Pump Number 4. In addition, the contractor has scheduled a meeting with the motor manufacture's representative at the job site to evaluate and confirm the information provided. The meeting is scheduled for Monday, May 15, 2000 at 11:00 a.m. We look forward to seeing you on Monday and are available to discuss this project further at your convenience. Enclosure Cc: Mr. Glenn Hollowell, P.E. Mr. Larry Davis j:\clerical\coppell\1999-153\letters\const~kNmotor veri~cation.doc 1 "!' · o Ma~llO O0 09:16a 81V9261911 RI~ General Contractor~ 8~w~9261911 . p.1 AUI, GENERAL CONTRACTORS 300 WEST RAMSEY FORT WORTH, TX 76110 FAX COVER SHEET 817/926-4377 OR FAX 817/926-4387 DATE: g'-t o -) ,c,o <p TIME: · .e,, .~ ., ...."COMPANY: FAX NO. 'fi'7:~ </7 1 ..,n, t5 / - 3~q FR, OM: <; TE- ;r' ~kE ~e~.. NO. OF PAGES (including cover sheet) COMMENTS: ':.-_ I Me~,'lO O0 09: 18a RUI General 05/88/2888 04:88 21433~/~35 Contractors 8179261911 QSLIN NATION ~ p.2 81 5~10 S. Westmoreland Dr. ~300, Dait~, Texa 75237 (P) 214~11-5850 (~ 972-988-1446 Oslin Nation Co. Steve Oeke - AUI Letter to vedfy NewMeier Following is the letler from GE Supply advising you that the motor is brand new. I have asked GE Supply as soon as possible get. documentation on the routine test of the motor (not available as this moment). As stated in item f~3, this will be forthcoming in the next 24 houm. We would like 2 days notice to arrange for the GE factory personnel to meet with the engineers and owners. it will be god if you can propose this Fdday or next Tuesday. 09: 16a 84: 08 RUI General 21433("B'35 Contractors 81 ?9261911 DSLIN NATION ~ P~GE p.3 82 -I 2025 W: Beltline Suite 114, Carrollton, TX 750~6 Billy Fortes M~ and Drive Sp~ialist May 8, 2000 GE Supply Nabil Azzam Ostin Nation Co, 5510 S, Westmorelandl300 Dallas, Texas 75237 e~ Re: City of Coppall addition of pump IN al~l Mr. Gary t-kmddcks letter dated 5/5/00. Dear Mr. Azzarn. In response tO Mr, Henddcks's letter died May 5, 2000. We confirm the following; The motor fumiehed to the Ctty of Coppell model tSKS513AN389M. $edal # ORG083004, 600hp, 1200 rpm, 4160 volts is a brand new motor and was specifically built for the City of Coppell and to Shirnelc, Jacobs & Finklea's specif'~tiorm. , This motor was built during the first quarter of 2000, for Odin Nation Co/City of Coppea under Oslin Nation Co. purchase order number DA-02283601~tA. It shipped from our facility, Oweneboro, KY on March 14, 2000. = The motor received a routine test. (date recorded is attached) This motor was purcrtaeed from GE Supply. GE Supply is the exclusive representative in the state of Texas. GE Suplcdy is ready to meet with the engineer and the City of Coppert · tO answer arty questions they may have abou( the referenced motor. When the motor arrived at the Job site it was determined that the conduit box was in the standard posrtlen (F-l), which the specifications drawings c~ailed for the (F-Z) position. The motor was transported to our authorized ~ervice center, Shermoo- Where this change procedure wa~ ar.,ompllShed. Again, we confirm that this motor Ls brand new and cardes the full warrap~/. , Sincerely, Billy Fuente~ Motor re'eel Drive 8peclalist ! 'T'