Loading...
ST0301A-CR100803T H E - C 1 T Y O F COPPELL r ors � � O F � 9 X A 5 } 8 PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP WEATHER TEMP WIND HUMIDITY SUN CLEAR OVERCAST RAIN SNOW To 32 32 -50 50-70 70 -85 85 up Still Mod High Report No Dry Mod Humid DAY M T T F S S AVERAGE FIELD FORCE NAME OF CONTRACTOR NON- MANUAL MANUAI. REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: n' AxI SIGNATURE ENGINEERING DEPT. INSPECTOR