ST0301A-CR100802T H E - C 1 T Y - O F
COFFELL
T �. w�l f X A s ' 9
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01 Phase II -A
OWNER: CITY of COPPELL
CONTRACTOR: JRJ PAVING, LP
WEATHER
TEMP
WIND
HL3.fIDTTY
DAY
SUN
7"
OVERCAST
RAIN
SNOW
To 32
32 -50
50-70
70 -85
85
Still
Mod
High
Report No
Dry
Mod
Humid
T � W � T F S � S
,75
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
NON-
MANUAL
MANUAL
REMARKS
VISITORS
TIME
REPRESENTATIVE
REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Q
r�� '
SIGNATURE
ENGINEERING DEPT. INSPECTOR