ST0301A-CR100730T H E - C 1 T Y - O F
COFFELL
T o
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01 Phase II -A
OWNER: CITY of COPPELL
CONTRACTOR: JRJ PAVING, LP
zl
WEATHER
TEMP
WIND
HUMIDITY
SUN
CLE
OVERCAST
RAIN
SNOW
To 32
32 -50
50 -70
70 -85
85 up
Still
M
High
Report No
Dry
Mod
Ildf6d
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
J
NON-
MANUAL
MANUAL
REMARKS
VISITORS
TIME
DAY
nT
REMARKS
W
T
F
S
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
J
NON-
MANUAL
MANUAL
REMARKS
VISITORS
TIME
REPRESENTATIVE
REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
S .� A4 to
Gd
SIGNATURE
ENGINEERING DEPT. INSPECTOR