Loading...
ST0301A-CR100729T H E C 1 T Y O F PROJECT: W. BETHEL ROAD (Denton Tap to Penfolds Ln) PROJECT NO. ST 03 -01 Phase II -A OWNER: CITY of COPPELL CONTRACTOR: JRJ PAVING, LP COPPELL _ F X A 5 t 8 9 AVERAGE FIELD FORCE NAME OF CONTRACTOR I2 7 NON- MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: SIGNATURE ENGINEERING DEPT. INSPECTOR WEATHER TEMP WIND HUMIDITY SUN CLE OVERCAST RAIN SNOW To 32 32 -50 50 -70 70 -85 85 Still Mu High Report No Dry Mod H d m DAY M T W T F S S 7jy121d'P