ST0301A-CR100729T H E C 1 T Y O F
PROJECT: W. BETHEL ROAD
(Denton Tap to Penfolds Ln)
PROJECT NO. ST 03 -01 Phase II -A
OWNER: CITY of COPPELL
CONTRACTOR: JRJ PAVING, LP
COPPELL _
F X A 5 t 8 9
AVERAGE FIELD FORCE
NAME OF CONTRACTOR
I2 7
NON-
MANUAL
MANUAL
REMARKS
VISITORS
TIME
REPRESENTATIVE
REPRESENTING
REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
ENGINEERING DEPT. INSPECTOR
WEATHER
TEMP
WIND
HUMIDITY
SUN
CLE
OVERCAST
RAIN
SNOW
To 32
32 -50
50 -70
70 -85
85
Still
Mu
High
Report No
Dry
Mod
H d
m
DAY M T W T F S S
7jy121d'P