Loading...
Duke Lesley-CS071206 (3) (8/9/2010) Keith Marvin - Meters/addressesPage 1 From: "Alex Bennett" <Alex.Bennett@dukerealty.com> To: <dingram@ci.coppell.tx.us>, "Keith Marvin (E-mail)" <kmarvin@ci.coppell.... CC: "Paul Byrne" <Paul.Byrne@dukerealty.com>, "Keith Flowers" <keith.flowers... Date: 12/6/2007 2:48 PM Subject: Meters/addresses Attachments: Scan001.PDF Debbie- Per our conversation, attached is the map of the meters & addresses that have been released and installed. Keith- We need some clarification on the impact fees paid. I know that I owe you for the 2- 2" irrigation meters on the infrastructure, but we should be paid up on the following - please verify. Infrastructure 2-2" irrigation**impact fees due Point West I 1-2" domestic 1-2" irrigation Point West VI 1-2" domestic 3-2" irrigation Point West VII 1-2" domestic 2-2" irrigation <<Scan001.PDF>> Thanks Alex Bennett, P.E. Development Services Manager Duke Realty Corporation 14241 N Dallas Pkwy, Suite 1000 Dallas, Texas 75254 p. 972.361.6714 f. 972.361.6800