Loading...
Duke Lesley-CS071210 (2) (8/9/2010) Keith Marvin - RE: Existing broken signal pull boxesPage 1 From: "Alex Bennett" <Alex.Bennett@dukerealty.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: "Larry Davis" <LDAVIS@ci.coppell.tx.us>, "Per Birdsall" <PBIRDSALL.Town_... Date: 12/10/2007 11:05 AM Subject: RE: Existing broken signal pull boxes Thanks Keith - Durable alerted us of the City's broken boxes as soon as they encountered them while pulling their cable. Alex -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Monday, December 10, 2007 10:58 AM To: Alex Bennett Cc: Larry Davis; Per Birdsall; Keith Flowers Subject: Re: Existing broken signal pull boxes Alex, The city will repair or replace the boxes that were damaged. This process would have been more timely if your contractor had notified us sooner than Thursday at 3:30pm. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Alex Bennett" <Alex.Bennett@dukerealty.com> 12/10/2007 10:22 AM >>> Keith/Per- What is the status of repair/replacement of the existing pull boxes I sent pictures of last week? We're in the process of attempting to final out the job and don't want the brand new fiber Durable pulled damaged due to the state of disrepair of the current City facilities at Lakeshore & Beltline. Thanks- Alex Bennett, P.E. Development Services Manager Duke Realty Corporation 14241 N Dallas Pkwy, Suite 1000 Dallas, Texas 75254 p. 972.361.6714 f. 972.361.6800